Regulatory proceedings and decisions have a significant role in the evolution and development of electricity markets. Information posted here includes proceedings and decisions relevant to the IESO. Refer to the "Achieved Proceedings" section under the Document Type dropdown menu for documents posted prior to Dec 31, 2004.

In Ontario, IESO usage fees and licence conditions are approved by the Ontario Energy Board (OEB). OEB codes, licences, and rate orders are of significance to the IESO. At the federal level, the National Energy Board (NEB) grants power export permits and approves international power lines.

In the U.S., the IESO is an active participant in American regulatory Proceedings at the Federal Energy Regulatory Commission (FERC), U.S. Department of Energy (DOE), and state regulatory commissions because of the relevance of market design and industry structure developments in the U.S.

Agency:

Document Type:


Recent Postings

Date Agency Document
Jan 9, 2014Ontario Energy Board2014 IESO Fees Submission - Notice of Application
Dec 24, 2013Ontario Energy BoardIESO Licence Compliance Report - 2013 Reliability Standards Activities for 2013
    Sep 27, 2013Ontario Energy BoardIESO Ontario Energy Board License
      Aug 1, 2013Ontario Energy BoardIESO Licence Compliance Report for Second Quarter 2013
        May 1, 2013Ontario Energy BoardIESO Licence Compliance Report for First Quarter 2013

          Regulatory Filings

          The IESO prepares Regulatory Filings and participates in various regulatory proceedings that will have an impact on the IESO-administered markets and IESO-controlled transmission grid.

          ONTARIO ENERGY BOARD
          Date Document
          Jan 9, 20142014 IESO Fees Submission - Notice of Application
          Dec 24, 2013IESO Licence Compliance Report - 2013 Reliability Standards Activities for 2013
          Mar 27, 2013IESO Licence Renewal Application
          Dec 24, 2012IESO Licence Compliance Report - 2012 Reliability Standards Activities for 2012
          Mar 23, 2012Smart Metering Charge Application
          Dec 19, 2011IESO 2011 Reliability Standards Compliance Report
          Apr 25, 2011Oral Hearing Transcript and Decision – IESO 2011 Fees Case
          Apr 19, 2011Letter from Paul Murphy, President and CEO, IESO to Cynthia Chaplin, Chair, OEB (MSP Report May 2010 - Oct 2010)
          Apr 5, 2011Board Procedural Order No. 2 – IESO 2011 Fees Case
          Jan 19, 2011Board Procedural Order No. 1 - IESO 2011 Fees Case
          Dec 23, 2010IESO 2010 Reliability Compliance Report Section I
          Dec 6, 20102011 IESO Fees Submission - Notice of Application
          Nov 3, 20102011 IESO Fees Submission (Complete Package)
          Apr 15, 20102010 IESO Fees Case Decision and Order
          Apr 15, 20102010 IESO Fees Case Settlement Proposal and Supporting Documentation
          Dec 23, 20092010 IESO Fees Case - OEB Procedural Order
          Dec 23, 2009IESO Reliability Compliance Report for Calendar Year 2009
          Dec 2, 2009Ministry of Energy and Infrastructure (MEI) approval of the IESO's 2010 - 2012 Business Plan
          Nov 26, 20092010 IESO Fees Submission - Notice of Application
          Nov 20, 2009OEB acknowledgement of 2010 IESO Fees Submission
          Nov 3, 20092010 IESO Fees Submission (Complete Package)
          Nov 3, 20092010 IESO Fees Submission (Individual Documents)
          Jun 15, 20092009 IESO Fees Case Cost Awards
          Jun 10, 2009IESO Comments on Distribution System Code Proposed Amendments
          Mar 31, 2009IESO 2009 Fees Case Decision and Order
          Feb 19, 20092009 IESO Fees Submission
          Feb 5, 2009IESO Undertaking No. JT1.1
          Jan 29, 20092009 IESO Fees Submission
          Dec 1, 2008IESO Comments to Proposed Transmission System Code (TSC) Changes
          Nov 19, 20082009 IESO Fees Submission - Notice of Application
          Nov 17, 2008IESO Submissions Regarding Kruger Energy Inc. Section 81 Proposal (EB-2007-0691)
          Nov 3, 20082009 IESO Fees Submission
          Oct 14, 2008IESO Response to the Power Advisory Report on Distributed Generation
          Aug 13, 2008IESO Comments to Board Staff Paper on Transmission Cost Allocation for Enabler Facilities
          May 20, 2008IESO Licence Renewal Application
          Mar 12, 20082008 IESO Fees Submission
          Jan 24, 20082008 IESO Fees Submission
          Dec 12, 20072008 IESO Fees Submission - Notice of Application
          Nov 26, 2007IESO Submissions in Relation to Kruger Energy Inc. Section 81 Notice of Proposal (EB-2007-0691)
          Nov 21, 2007IESO Submissions Regarding Lennox RMR Contract Review and Approval (EB-2007-0715)
          Nov 2, 20072008 IESO Fees Submission
          Sep 14, 2007IESO Application for Smart Metering Entity Licence
          Aug 3, 2007IESO Submissions on Consultation on the Practice Direction on Cost Awards
          Jun 19, 2007IESO Response to Motions Regarding Bruce to Milton Tx. Leave to Construct Application (EB-2007-0050)
          Feb 9, 2007Application by the Association of Major Power Consumers in Ontario for a Market Rule Amendment Review
          Nov 29, 2006IESO Submissions Regarding Lennox RMR Contract Review and Approval (EB-2006-0205)
          Nov 10, 2006OEB’s Notice of Application and Hearing on IESO’s 2007 Fees Submission
          Oct 30, 2006IESO 2007 Fees Submission:
          Oct 2, 2006Comments on OEB Staff Discussion Paper Regarding IPSP and Procurement Processes
          May 8, 2006IESO Letter supporting NERC as the ERO for North America
          May 1, 2006IESO Comments on Natural Gas Electricity Interface and Storage Regulation Review
          Mar 1, 2006IESO Submissions on Lennox Reliability Must-Run Contract
          Jan 20, 2006IESO Compliance Filing Regarding Rural or Remote Electricity Protection
          Dec 15, 2005IESO Submission on proposed Distribution System Code (Chapter 3) changes
          Dec 2, 2005IESO Comments on Issues Regarding Upcoming NGEIR Hearing
          Nov 30, 2005IESO Comments on Standard Offer Program Discussion Paper
          Nov 18, 2005IESO Performance Indicators - Day at Hand Forecast
          Resolution of Commitments Regarding IESO's 2005 Fees Submission for Review Settlement Agreement
          Nov 14, 2005OEB's Notice of Application and Hearing on IESO's 2006 Fees Submission
          Nov 4, 2005IESO Submission Regarding York Region Holland Junction Proposal
          Oct 27, 2005IESO 2006 Fees Submission:
          Mar 17, 2005Final Comments on Niagara Transmission Reinforcement Proposal
          Feb 21, 2005IESO Comments on Proposed Revised Transmission System Code
          NATIONAL ENERGY BOARD
          Date Document
          May 23, 2006Application to Export Electricity on an Emergency Basis to the United States
          Feb 20, 2006IESO Comments on the NEB's Proposed Cost Recovery Concept
          Feb 3, 2006IESO Initial Comments on Draft Electricity Facilities Filing Manual
          FEDERAL ENERGY REGULATORY COMMISSION
          Date Document
          Aug 13, 2010IESO Filing in Response to FERC Order on the NYISO Broader Markets Initiative
          Sep 22, 2009Joint IESO filing with NBSO and NSPI to FERC on the Proposed NPCC BES Definition
          Dec 22, 2008IRC/SRC Comments to FERC on TLR and IROL Compliance Filing by NERC
          Dec 15, 2008IESO Response to FERC NOPR on NERC Provided Interpretations to the BAL and VAR Standards
          Oct 17, 2008IESO and Hydro One Joint Response to FERC clarification Rule on Applicability of Cyber Security Standards to the Nuclear Industry
          Oct 16, 2008IESO Response to the Facility Ratings (FAC) Standards NOPR from FERC
          Jul 31, 2008IESO Comments in support of NYISO's Exigent Circumstances Filing
          May 13, 2008ISO/RTO Council Comments on FERC Nuclear Standards NOPR
          May 12, 2008IESO and Hydro One Comments on FERC Nuclear Standards NOPR
          Jan 28, 2008ISO/RTO Council Request for Clarification/Rehearing on FAC Order
          Oct 5, 2007IESO Comments on FERC CIP Standards NOPR
          Oct 5, 2007ISO/RTO Council Comments on FERC CIP Standards NOPR
          Oct 4, 2007CEA Comments on FERC CIP Standards NOPR
          Sep 21, 2007IESO Comments on FERC FAC Standards NOPR
          Sep 19, 2007Joint IESO and NYISO Comments on FERC FAC Standards NOPR
          Sep 19, 2007ISO/RTO Council Comments on FERC FAC Standards NOPR
          Feb 12, 2007IESO Comments on FERC Staff Review of NERC CIP Standards
          Feb 12, 2007ISO/RTO Comments on FERC Staff Review of NERC CIP Standards
          Jan 3, 2007ISO/RTO Council Comments on NERC Standards NOPR
          Jan 3, 2007IESO Comments on NERC Standards NOPR
          Dec 22, 2006CEA Comments on NERC Standards NOPR
          Nov 17, 2006ISO/RTO Council Comments on NERC’s Non-Governance Filing
          Sep 20, 2006CEA Reply Comments on OATT NOPR
          Sep 13, 2006ISO/RTO Motion to Intervene on NERC 2007 Business Plan
          Aug 21, 2006ISO/RTO Council Request for Clarification on FERC ERO Certification Order
          Jul 6, 2006IESO Statement at ERO Reliability Standards Technical Conference
          Jun 26, 2006CEA Comments on Staff's review of NERC standards
          Jun 26, 2006IESO Comments on Staff's review of NERC standards
          Jun 26, 2006ISO/RTO Council Comments on Staff's review of NERC standards
          May 4, 2006ISO/RTO Council Comments ERO Application
          Apr 25, 2006ISO/RTO Council Motion to Intervene on ERO Application
          Mar 6, 2006ISO/RTO Council Request for Rehearing on ERO Order 672
          Nov 22, 2005ISO/RTO Council Comments on OATT NOI
          Nov 22, 2005CEA Comments on OATT NOI
          Nov 18, 2005ISO/RTO Council Comments on Electricity Market Competition Task Force
          Nov 18, 2005IESO (Kim Warren) Comments at ERO Certification Technical Conference
          Oct 7, 2005IESO Comment on ERO NOPR
          Oct 7, 2005ISO/RTO Council Comments on ERO NOPR
          Aug 26, 2005IESO Comments on Accounting and Financial Reporting NOPR
          Aug 26, 2005ISO/RTO Council Comments on Accounting and Financial Reporting NOPR
          Aug 15, 2005ISO/RTO Council Comments on Information Requirements for Available Transfer Capacity
          Jul 1, 2005ISO/RTO Council Comments on NOPR Standards for Business Practices and Communication Protocols
          Apr 4, 2005ISO/RTO Council Comments on Reactive Power Supply and Consumption Paper
          Apr 4, 2005IESO Comments on Reactive Power Supply and Consumption Paper
          Mar 17, 2005ISO/RTO Council Supplementary Comments on Financial Reporting and Cost Accounting Practices
          US PUBLIC SERVICE COMMISSION
          Date Document
          Mar 1, 2006IESO Comments to Michigan Public Service Commission - Capacity Needs Forum
          OTHER REGULATORY DOCUMENTS
          Date Document
          Aug 30, 2010Mapping of IESO Activities to FERC Accounts - Q2 2010
          May 28, 2010Mapping of IESO Activities to FERC Accounts - Q1 2010
          Feb 25, 2010Mapping of IESO Activities to FERC Accounts - Q4 2009
          Nov 30, 2009Mapping of IESO Activities to FERC Accounts - Q3 2009
          Aug 28, 2009Mapping of IESO Activities to FERC Accounts - Q2 2009
          Jul 6, 2009Ontario Uniform Transmission Rate Schedule Effective July 1, 2009
          May 29, 2009Mapping of IESO Activities to FERC Accounts - Q1 2009
          Feb 13, 2009Mapping of IESO Activities to FERC Accounts - Q4 2008
          Dec 9, 2008Ontario Transmission Rate Schedules (Effective January 1, 2009)
          Nov 14, 2008Mapping of IESO Activities to FERC Accounts - Q3 2008
          Sep 16, 2008Lennox Generation Station Deregistration Analysis
          Aug 15, 2008Mapping of IESO Activities to FERC Accounts - Q2 2008
          May 16, 2008IESO Comments on NERC 2009 Budget Ver 1.1
          May 15, 2008Mapping of IESO Activities to FERC Accounts - Q1 2008
          Feb 15, 2008Mapping of IESO Activities to FERC Accounts - Q4 2007
          Dec 14, 2007IESO Submission to the Ministry of the Environment re: OWA Class EA
          Dec 13, 2007CEA Letter to NERC on Section 1600
          Nov 15, 2007Mapping of IESO Activities to FERC Accounts - Q3 2007
          Nov 1, 2007Amended Transmission Rate Schedule - Nov 1, 2007
          Aug 15, 2007Mapping of IESO Activities to FERC Accounts - Q2 2007
          Jul 24, 2007IESO Response to NERC on FERC’s Order 693 Data Requests
          Jul 3, 2007IESO Comments to NERC on Rules of Procedure (Sec 1600) draft revision
          Jun 25, 2007CEA Comments to NERC on Rules of Procedure (Sec 1600) draft revision
          May 15, 2007Mapping of IESO Activities to FERC Accounts - Q1 2007
          May 14, 2007Lennox Generation Station Deregistration Analysis
          Apr 18, 2007Mapping of IESO Activities to FERC Accounts - Annual and Q4 2006
          Nov 15, 2006Mapping of IESO Activities to FERC Accounts - Q3 2006
          Aug 15, 2006Mapping of IESO Activities to FERC Accounts - Q2 2006
          Aug 11, 2006IESO Reply to NERC Request for Comment on FERC ERO Certification Order
          Aug 11, 2006CEA Reply to NERC Request for Comment on FERC ERO Certification Order
          Aug 11, 2006ISO/RTO Council Reply to NERC Request for Comment on FERC ERO Certification Order
          Jul 7, 2006IESO Comment on NERC’s 2007 Budget and Business Plan - Draft 2
          Jul 7, 2006CEA Comment on NERC’s 2007 Budget and Business Plan - Draft 2
          Jun 22, 2006Natural Resources Canada Posting of Conference on the Implementation of the Blackout Task Force's Recommendations
          Feb 28, 2006ISO/RTO Comments to NERC on the Second Draft ERO Application
          Feb 28, 2006IESO Comments to NERC on the Second Draft ERO Application
          Jan 13, 2006CEA Comments to NERC on First Draft ERO Application
          Jan 13, 2006ISO/RTO Council Comments to NERC on First Draft ERO Application
          Jan 13, 2006IESO Comments to NERC on First Draft ERO Application
          Dec 8, 2005Amended Ontario Transmission Rate Schedule
          Aug 3, 2005Principles for Electric Reliability Organization
          OTHER AGENCIES
          Date Document
          Feb 28, 2005Comments on Minister of Energy Transmission and Distribution Review Paper

          Decisions with Reasons

          Decisions with Reasons posted here relate to regulatory proceedings in which the IESO was a party or participant.

          ONTARIO ENERGY BOARD
          Date Document
          Dec 21, 2011Ontario Uniform Transmission Rate Schedule Effective January 1, 2012
          Jan 18, 2011Ontario Uniform Transmission Rate Schedules - Effective Jan 1, 2011
          Dec 21, 2010OEB Decision Regarding 2011 Renewable Generation Connection Rate Protection Compensation Amount
          Dec 20, 2010OEB Decision Regarding 2011 Rural Rate Settlement Charge
          Jan 21, 2010Ontario Uniform Transmission Rate Schedule Effective January 1, 2010
          Dec 24, 2009OEB Decision with Reasons Regarding 2010 RRRP Charge
          Sep 15, 2008Bruce to Milton 500 kV Transmission Line Leave to Construct Decision and Order
          Jul 4, 2008IESO Licence Renewal Application
          Apr 22, 20082008 IESO Fees Submission
          Dec 21, 2007Decision with Reasons Regarding the 2007-2008 Lennox RMR Contract
          Apr 10, 2007OEB Decision and Order, Market Rule Amendment Review
          Mar 21, 2007OEB Decision on IESO 2007 Fee Application
          Jan 22, 2007Decision with Reasons Regarding Second Lennox Reliability Must-Run Contract
          Mar 13, 2006OEB Decision Regarding Lennox Reliability Must-Run Contract
          Feb 14, 2006OEB Decision on IESO 2006 Fee Application
          Dec 8, 2005Great Lakes Power Transmission Rate Decision and Order
          Jul 28, 2005Superior Wind Prince Power Leave to Construct Decision and Order
          Jul 25, 2005Final Amended Transmission System Code
          Jul 18, 2005DeBeers Transmission Facilities Leave to Construct Decision and Order
          Jul 8, 2005Niagara Transmission Reinforcement Decision and Order
          Jun 27, 2005Erie Shores Wind Farm Leave to Construct Order
          May 24, 20052005 Order approving IESO Expenditure, Revenue Requirements and Fees
          May 18, 2005Niagara Transmission Reinforcement Interim Decision and Procedural Order
          Mar 11, 2005Downtown Toronto Transmission Cable Decision with Reasons

          IESO Licences and Permits

          IESO Licences and Permits issued by the Ontario Energy Board and the National Energy Board allow the IESO to discharge its duties to oversee of the IESO-administered markets and operate the IESO-controlled grid, as well as to facilitate emergency exports to neighbouring jurisdictions in the United States.

          ONTARIO ENERGY BOARD
          Date Document
          Sep 27, 2013IESO Ontario Energy Board License
          May 18, 2012Notice of Application by the Smart Metering Entity for Approval of a Smart Metering Charge
          Jan 27, 2011Smart Metering Entity Licence
          NATIONAL ENERGY BOARD
          Date Document
          Apr 16, 2013Emergency Energy Export Permit EPE-289
          Mar 4, 1999Unscheduled Circulating Power and Energy EPE-22

          Licence Compliance Reports

          ONTARIO ENERGY BOARD
          Date Document
          Aug 1, 2013IESO Licence Compliance Report for Second Quarter 2013
          May 1, 2013IESO Licence Compliance Report for First Quarter 2013
          Jan 30, 2013IESO Licence Compliance Report for Fourth Quarter 2012
          Nov 1, 2012IESO Licence Compliance Report for Third Quarter 2012
          Jul 20, 2012IESO Licence Compliance Report for Second Quarter 2012
          Apr 20, 2012IESO Licence Compliance Report for First Quarter 2012
          Jan 30, 2012IESO Licence Compliance Report for Fourth Quarter 2011
          Oct 31, 2011IESO Licence Compliance Report for Third Quarter 2011
          Jul 21, 2011IESO Licence Compliance Report for Second Quarter 2011
          Apr 6, 2011IESO Licence Compliance Report for First Quarter 2011
          Jan 10, 2011IESO Licence Compliance Report for Fourth Quarter 2010
          Dec 23, 2010IESO 2010 Reliability Compliance Report Section I
          Oct 6, 2010IESO Licence Compliance Report for Third Quarter 2010
          Jul 8, 2010IESO Licence Compliance Report for Second Quarter 2010
          Apr 19, 2010IESO Licence Compliance Report for First Quarter 2010
          Jan 11, 2010IESO Licence Compliance Report for Fourth Quarter 2009
          Oct 9, 2009IESO Licence Compliance Report for Third Quarter 2009
          Jul 27, 2009IESO Licence Compliance Report for Second Quarter 2009
          Apr 8, 2009IESO Licence Compliance Report for First Quarter 2009
          Jan 23, 2009Rural or Remote Rate Protection Charge Collected in 2008
          Jan 21, 2009IESO Licence Compliance Report for Fourth Quarter 2008
          Dec 22, 2008IESO Reliability Compliance Report for Calendar Year 2008
          Oct 24, 2008IESO License Compliance Report for Third Quarter 2008
          Jul 18, 2008IESO Licence Compliance Report for Second Quarter 2008
          Apr 23, 2008IESO Licence Compliance Report for First Quarter 2008
          Jan 25, 2008IESO Reliability Compliance Report for Calendar Year 2007
          Jan 23, 2008IESO License Compliance Report for Fourth Quarter 2007
          Jan 16, 2008Rural or Remote Rate Protection Charge Collected in 2007
          Oct 30, 2007IESO License Compliance Report for Third Quarter 2007
          Jul 24, 2007IESO License Compliance Report for Second Quarter 2007
          Apr 27, 2007IESO License Compliance Report for First Quarter 2007
          Feb 19, 2007Rural or Remote Rate Protection Charge Collected in 2006
          Jan 26, 2007IESO License Compliance Report for Fourth Quarter 2006
          Dec 21, 2006IESO Reliability Compliance Report for Calendar Year 2006
          Oct 20, 2006IESO License Compliance Report for Third Quarter 2006
          Jul 14, 2006License Compliance Report for Second Quarter 2006
          Apr 13, 2006License Compliance Report for First Quarter 2006
          Jan 27, 2006License Compliance Report for Fourth Quarter 2005
          Jan 18, 2006IESO Reliability Compliance Report for Calendar Year 2005
          Oct 19, 2005License Compliance Report for Third Quarter 2005
          Jul 18, 2005License Compliance Report for Second Quarter 2005
          Apr 21, 2005License Compliance Report for First Quarter 2005
          Jan 21, 2005License Compliance Report for Fourth Quarter 2004
           
          Copyright © 2019 Independent Electricity System Operator