Technical Support Group - Enhanced Day-Ahead Commitment

The objective of this Technical Support Group (TSG) is to offer comments on the design for the enhanced day-ahead commitment (EDAC) project. 

Members of the TSG will review the materials provided by the IESO EDAC project team and provide detailed technical advice to the IESO in an efficient and timely manner.  Guidance from the TSG will be reflected in updates to the high level design document, to the Stakeholder Advisory Committee (SAC) and the IESO’s recommendations to the Board of Directors.

Background information on day-ahead market evolution can be found here.

Terms of Reference
Working Group

EDAC Market Design, Version 1.0

Working Sessions and Proposed Activities
Date
Agenda/Minutes
Supporting Material
February 10, 2009 Final Summary of Stakeholder Engagement Effectiveness
February 6, 2009 Posting of EDAC Market Design, Version 1.0
January 29, 2009
Agenda
Minutes
 • Calculating PCG Using Excel
     • The Excel tool
 • Financially Binding Status Paper
     • Presentation
 • EDAC Market Design Summary
 • EDAC Market Design Issue Log v0.4
Additional Material
 • Minimum Loading Point in EDAC
January 21, 2009
Agenda
Minutes
 • Combined Cycle Modeling
 • Scheduling Wheels in EDAC
 • Day-Ahead Failure Charge - Linked Wheels
 • Day-Ahead Failure Charge - Update
 • Production Cost Guarantees
 • Incorporating Operating Reserves in the Day-Ahead PCG Calculation (LECG)
 • PCG Eligibility
 • Financially Binding Status

December 18, 2008
Agenda
Minutes

 • EDAC Three-Part Offers
 • Day Ahead Commitment Withdraw Charge
 • Day-Ahead Failure Charge
 • Day-Ahead Production Cost Guarantee (DA-PCG)
 • DA-PCG for Pseudo Units
 • IOG Offset

November 26, 2008
Agenda
Minutes

Item 1: Project Schedule and Milestones
Item 2: Pseudo Units Design (Revised November 28, 2008)
 • EDAC Combined Cycle Modeling
Item 3: Updated Design Document Document on Portal
 • Presentation
Item 4: IOG Offset
Item 5: Export Failure Charges
Item 6: Ramp Impacts on EDAC
November 6, 2008
Agenda
Minutes (Revised
Dec. 5, 2008)
Financially Binding Status
Treatment of Quick Start Facilities
End/Start of Day Boundary Considerations Part 2 - Examples
Calculation Engine
Export Discussion Document
Data Submission Criteria During and After EDAC
Analysis on the Impact of Ramp in EDAC
Terms of Reference
Export Inclusion
Other Items
October 15, 2008
Agenda
Minutes
Discussion items for meeting
• De-commitments and Withdrawals
• Availability Declaration Envelope (ADE)
• Boundary Considerations
• EDAC Calculation Engine
• EDAC Day-Ahead Timelines
• Revised Terms of Reference (Draft)
• Project Schedule
 