EDAC Settlements Design Working Group

Two design working groups have been formed to provide the opportunity to offer detailed design level input.   The Settlements Design Working Group will  focus on settlements related systems and process areas including cost guarantees, failure charges and settlement system changes.

The Working Group is  responsible for providing:

  • Advice on the impact of market facing IESO business processes and technical interfaces associated with the changes brought about by EDAC on their business process and systems.
  • Clarification and potential resolution of issues that relate to the implementation of the design principles as described in the Enhanced Day Ahead Commitment Market Design Document V1.0
Terms of Reference
Working Group Membership (Revised)

Working Sessions and Proposed Activities

Note: Materials, including agendas for the working group will be available to members within the web portal. If stakeholders outside the membership require any materials, they should send a request to stakeholder.engagement@ieso.ca

Date
Agenda/Minutes
Supporting Material Expected Actions
December 7, 2009
   
August 12, 2009
Meeting Deferred  
June 24, 2009
Minutes
• Settlement Statements and Charge Types
• Charge Types - DA-IOG
• Charge Types - DA-PCG
• Charge Types - Generator Withdrawal Charges
• Charge Types - Intertie Failure Charge
 
June 4, 2009
Agenda
Minutes
• Outstanding Action Items
• Intertie Failure Charges
• Generator Withdrawal Charge
• Scheduling Linked-Wheels in EDAC
 
May 13, 2009
Agenda
Minutes
• Real-time Issues
• Start‐Up Costs for Generators Running at the End of the Previous Day
• Day-Ahead Intertie Offer Guarantees
• Eligibility Requirements DA-PCG Calculation
• Example Offers over 20 Days
• Excluding a Constrained Day 1 MGBRT from a Day 2 DA‐PCG Calculation
• Current DACP/SGOL Eligibility Criteria
• Net OR Revenue DA-PCG Calculation – Component 4
 
April 21, 2009
Agenda
Minutes
• Settlements DWG Terms of Reference
• Day Ahead Production Cost Guarantee
 
March 31, 2009
Agenda
First Working Group Meeting
• EDAC Training Day
• Overview of DACP & High Level Design of Enhanced Version (EDAC)
• Stakeholdering Methodology
• Guide to IESO Portal Collaboration
Stakeholder Feedback
• Summary of Session Feedback
Training to bring all members to same level of knowledge
 