Status of Applications received after April 30, 2005

The following are the possible states of the status column:
  • "Complete" indicates that reports are available for viewing.
  • "Active" indicates that work is in progress.
  • "On Hold" indicates that the assessment was placed on hold because the projects has been delayed.
Projects:
Status:

Last Updated: April 3, 2008

CAA ID Proponent Location Project
Type
Proposed
Size
In-service
Date
Current Status of System
Impact Assessment
Report
2004-176 CANADIAN NIAGARA POWER Cornwall, Eastern Ontario Transmission 150 MVAR
Under Construction
Complete Final Report
Addendum 1
2005-201 VECTOR WIND ENERGY INC. Amherst Island New Generation 24 MW
Q4-2007
On-Hold  
2005-202 POWERSTREAM INC. 8000 Dufferin St., Vaughan, ON New Supply Point 175 MW
In-Service
Complete Report
2005-204 VISION QUEST WINDELECTRIC Amberley, Bruce County & Ashfield, Huron Ontario New Generation 75 MW

On-Hold  
2005-205 GREEN BREEZE Central Huron Municipality, Huron County New Generation 79.5 MW
Q3-2007
On-Hold  
2005-206 BARRINGTON WIND ENERGY LTD. Concession A, 9 and 10; Huron-Kinloss Township New Generation 18 MW
-
Withdrawn  
2005-207 FIVE NATIONS ENERGY INC Fort Albany TS New Supply Point 20 MVA
Under Construction
Complete Report
2005-208 HYDRO ONE NETWORKS INC. Kenora Interconnection 400 MW
N/A
On-Hold  
2006-209 HYDRO ONE NETWORKS INC. Oshawa Area New Supply Point 250 MVA
Q4-2009
Active Final Draft Report
2006-211 HYDRO ONE NETWORKS INC. King Township or East Gwillimbury New Supply Point 32.4 MVAR
175 MVAR
Q2-2009
Q3-2007
Active Phase I Report
Phase II Final Draft Report
2006-212 HYDRO ONE NETWORKS INC. Build 50/83 MVA, 230-27.6 kV Transformer Station New Supply Point 83 MVA
In-Service
Active Final Draft Report
2006-214 ONTARIO POWER GENERATION INC. Pickering GS New Generation 76 MW
In-Service
Complete Report
2006-215 HYDRO ONE NETWORKS INC. Cambridge Preston TS Transmission 250 MVA
Q4-2007
Active Final Draft Report
2006-216 REGIONAL POWER INC. Town of Mobert New Generation 11.11 MVA
9.44 MVA
Q2-2011
Q4-2009
Active  
2006-220 HYDRO ONE NETWORKS INC. Claireville TS Transmission - Q4-2009
Complete Report
2006-221 HYDRO ONE NETWORKS INC. Meadowvale TS/Halton TS Low Voltage Reactive Compensation 21.6 MVAR
32.4 MVAR
In-Service
In-Service
Complete Report
2006-223 HYDRO ONE NETWORKS INC. Porcupine TS, Kirkland Lake TS Reactive Compensation - Q4-2010
Active Final Draft Report
Diagrams
2006-224 HYDRO ONE NETWORKS INC. Milton-Claire 500kV ROW Intersects R21T/R19T Pleas Transmission - Q2-2009
Complete Report
2006-225 HYDRO ONE NETWORKS INC. Woodstock, Ontario New Supply Point 41 MVA
Under Construction
Active Final Draft Report
2006-226 NORTH AMERICAN PALLADIUM Lac Dec Iles Mine (90km north of Thunder Bay) Additional Load 10
Under Construction
Complete Final Report
2006-227 HYDRO ONE NETWORKS INC. Township of Tosoronto-Cnty Road 5 & County Road 15 New Supply Point - Q2-2007
Active Final Draft Report
2006-228 HYDRO ONE NETWORKS INC. Town of Red Lake Additional Load - In-Service
Complete Final Draft Report
2006-230 HYDRO ONE NETWORKS INC. Vicinity-Winston Churchill Blvd, North-West Miss New Supply Point - Q2-2009
Active Final Draft Report
2006-231 HYDRO ONE NETWORKS INC. North-West Brampton, Ontario New Supply Point - Q2-2008
Active Final Draft Report
2006-233 HYDRO ONE NETWORKS INC. Detweiler TS, Orangeville TS Reactive Compensation 245 MVAR
Under Construction
Active Final Draft Report
2006-236 BROOKFIELD WIND POWER CORPORATION Near the town of Comber, Southwestern Ontario New Generation 150 MW
Q4-2009
Active  
2006-237 BROOKFIELD WIND POWER CORPORATION North of SSM, Twnp of Spider, Northern Ontario New Generation 150 MW
Q4-2009
Active  
2006-238 HYDRO ONE NETWORKS INC. Mid-town Toronto Transmission - Q2-2010
Active Final Draft Report(2)
2006-239 ONTARIO POWER GENERATION INC. 70km Northeast of Kapuskasing New Generation 441 MW

Active  
2006-240 TORONTO HYDRO ENERGY SERVICES INC. Toronto, Ontario, Canada New Generation 30 MVA

On-Hold  
2006-241 ONTARIO POWER GENERATION INC. Twnp of Gillies Timber Limit, Dist of Temiskaming New Generation 44 MW

Active  
2006-245 HYDRO OTTAWA LIMITED Cyrville Road Ottawa New Supply Point - Q2-2008
Complete Final Report
2006-246 HYDRO ONE NETWORKS INC. Richview TS Transmission -
Active  
2006-247 HYDRO ONE NETWORKS INC. Lakehead TS Reactive Compensation 60 MVAR
Q1-2009
Active Final Draft Report
2006-248 HYDRO ONE NETWORKS INC. On the existing R21T/R19T, Plesant tap R-O-W Transmission - Q2-2009
Active Final Draft Report
2006-249 HYDRO ONE NETWORKS INC. Line Section Between Hanover TS and Orangeville TS Transmission - Q1-2009
Active Final Draft Report
2006-250 HYDRO ONE NETWORKS INC. Southwestern Ontario Transmission - Q4-2011
Active Final Draft Report
Diagrams
2006-251 TORONTO HYDRO-ELECTRIC SYSTEM LIMITED Metro Tor Conv Ctre & John Street Pumping Station New Generation 11 MW
Under Construction
Complete Report
2006-252 ONTARIO POWER GENERATION INC. Beck 1 Generation Station New Generation 68.5 MVA
Q4-2008
Complete Final Report
2006-253 HYDRO ONE NETWORKS INC. Woodstock, Ontario Transmission - Q2-2010
Active Final Draft Report
2007-254 ONTARIO POWER GENERATION INC. Mississauga New Generation 900 MW
Q1-2011
Active  
2007-257 HYDRO ONE NETWORKS INC. St. Catherines Area Transmission - Q2-2009
Active Final Draft Report
2007-258 HYDRO ONE NETWORKS INC. City of St. Catherine Transmission - Q2-2010
Active Final Draft Report
2007-259 LAKESHORE GOLD CORP Timmins (Hwy 101 W & 144) Additional Load - Q3-2007
Complete Report
2007-260 HYDRO ONE NETWORKS INC. Build 25/41 MVA, 230-27.6 kV Transformer Station New Supply Point 57 MVA
Q2-2009
Active  
2007-263 HYDRO ONE NETWORKS INC. Municipality of Windsor and Essex County Transmission 500 MVA
Q2-2010
Active Final Draft Report
2007-264 HYDRO ONE NETWORKS INC. 9513 Goreway Dr, Brampton (at existing Goreway TS) New Supply Point 175 MVA
Q4-2009
Active  
2007-265 HYDRO ONE NETWORKS INC. Keith TS Transmission Upgrades 500 MVA
Q4-2009
Active  
2007-266 ONTARIO POWER GENERATION INC. Geographic Township of Gouin, District of Sudbury New Generation 5.6 MVA
Q4-2010
Active  
2007-269 HYDRO ONE NETWORKS INC. Multiple Stations New Generation -
Active  
2007-270 WIKWEMIKONG UNCEDED INDIAN RESERVE Wikwemikong, Ontario New Generation 124 MW

Active  
2007-272 CPV CANADA DEVELOPMENTS INC. 2384 Dundas Road South, Cambridge, Ontario New Generation 500 MVA
Q2-2010
Active  
2007-273 BROOKFIELD WIND POWER CORPORATION Renfrew Area-Vicinity of Mount Chute GS, East ON New Generation 99 MW
Q4-2009
Active  
2007-274 BROOKFIELD WIND POWER CORPORATION Near Madawas-Vicinity of Wallance TS, Eastern ON New Generation 199.5 MW
Q4-2009
Active  
2007-275 FPLE CANADIAN WIND, ULC Huron County, Ontario New Generation 63 MW

Active  
2007-276 FPLE CANADIAN WIND, ULC Lambton County, Ontario New Generation 249 MW
Q4-2013
Active  
2007-277 FPLE CANADIAN WIND, ULC Huron County, Ontario New Generation 87 MW

Active  
2007-278 FPLE CANADIAN WIND, ULC Lambton County, Ontario New Generation 84 MW
Q4-2009
Active  
2007-279 BROOKFIELD POWER Aguasabon River New Generation 9 MW

Active  
2007-280 FPLE CANADIAN WIND, ULC Lambton and Middlesex Counties, Ontario New Generation 349.5 MW
Q4-2013
Active  
2007-281 BUTTCON LTD. Windsor, Ontario New Generation 14 MW

Active  
2007-282 KABINAKAGAMI POWER LP Kabinakagami River north Hwy 11, south Roger's Rd New Generation 60 MW
Q4-2015
Active  
2007-283 CPV CANADA DEVELOPMENTS INC. 768 Haldimand Rd 55, Jarvis,ON, Lot7, Concession 7 New Generation 1758 MVA
Q4-2012
Active  
2007-284 TERRACE BAY PULP INC. Terrace Bay, Ontario New Generation 29.5 MVA
Q2-2008
Active  
2007-285 4444388 CANADA INC. Beardmore, Ontario New Generation 10 MW
Q3-2009
Active  
2007-286 SKYPOWER CORP. Parry Island, Ontario New Generation 150 MW
Q4-2009
Active  
2007-287 AIM POWERGEN CORPORATION County of Chatham-Kent north of Chatham New Generation 150 MW
Q4-2010
Active  
2007-288 AIM POWERGEN CORPORATION County of Chatham-Kent Near the Town of Blenheim New Generation 154.5 MW
Q4-2010
Active  
2007-289 AIM POWERGEN CORPORATION Essex County Near the Town of Tilbury New Generation 40 MW
Q4-2010
Active  
2007-291 SKYPOWER CORP. North of Picton, ON New Generation 99 MW
Q4-2009
Active  
2007-292 SKYPOWER CORP. Near Foymount, South of Lake Clear New Generation 150 MW
Q4-2009
Active  
2007-293 AIR ENERGY TCI INC. (TCI RENEWABLES) Vicinity of Adelaide, Adelaide-Metcalfe, Ontario New Generation 74 MW
Q4-2011
Active  
2007-295 HYDRO ONE NETWORKS INC. Buchanan TS, Middleport TS, Nanticoke TS Reactive Compensation 1700 MVAR
Q2-2009
Active Final Draft Report
2008-297 SUNCOR ENERGY INC. Chatham-Kent Area, South-Western Ontario New Generation 76 MW

Active  
2008-298 HYDRO ONE NETWORKS INC. Vicinity of the Toyota Woodstock Plant New Supply Point & Transmission 117 MVA
Q2-2010
Active  
 