Status of Expedited System Impact Assessment Applications

This list contains all transmission, load, generation and ancillary services connection proposals that meet the requirements described in section 9.2. Links are provided for expedited System Impact Assessment (SIA) reports.

The following are the possible states of the status column:
  • "Complete" indicates that Notifications of Approval are available for viewing.
  • "Active" indicates that work is in progress.
  • "On-Hold"indicates that the assessment was placed on hold because the projects has been delayed.
  • "Withdrawn" indicates that the request was to produce an SIA report was withdrawn.
Last Updated: January 31, 2014
CAA ID Proponent Project Name Location Project Type Proposed In-Service Date Status Report
2001-EX001 ENBRIDGE PIPELINES INC. ENBRIDGE Hilton Like for Like 2001-Q3 Complete Report
2001-EX002 ABITIBI-CONSOLIDATED COMPANY OF CANADA ABITIBI Consolidated Calm Lake Like for Like 2002-Q2 Complete Report
2001-EX003 HYDRO ONE NETWORKS INC. HYDRO ONE Manby TS Like for Like 2001-Q4 Complete Report
2001-EX004 ONTARIO POWER GENERATION - HYDRO OPG Lambton Like for Like 2001-Q4 Complete Report
2001-EX005 HYDRO ONE NETWORKS INC. HYDRO ONE Cobden TS Low Voltage Feeder Breaker 2002-Q3 Complete Report
2001-EX006 HYDRO ONE NETWORKS INC. HYDRO ONE Chenaux TS New Breakers 2003-Q3 Complete Report
2001-EX007 HYDRO ONE NETWORKS INC. HYDRO ONE Lennox TS Protection Modifications 2001-Q4 Complete Report
2001-EX008 HYDRO ONE NETWORKS INC. HYDRO ONE Ottawa Area Load Transfer 2001-Q4 Complete Report
2001-EX009 HYDRO ONE NETWORKS INC. HYDRO ONE Q6S Transmission 2002-Q2 Complete Report
2001-EX010 HYDRO ONE NETWORKS INC. HYDRO ONE Cyrville Jct. Like for Like 2002-Q4 Complete Report
2001-EX011 HYDRO ONE NETWORKS INC. HYDRO ONE Allanburg TS Transmission 2002-Q4 Complete Report
2001-EX012 ONTARIO POWER GENERATION - HYDRO SCR Lambton Selective Catalytic Reduction 2002-Q2 Complete Report
2001-EX014 HYDRO ONE NETWORKS INC. HYDRO ONE Kenora TS Transmission 2002-Q3 Complete Report
2002-EX015 ONTARIO POWER GENERATION - HYDRO OPG Nanticoke Replacement of Generator Controls 2003-Q4 Complete Report
2002-EX016 HYDRO ONE NETWORKS INC. HYDRO ONE Sheppard TS Low Voltage Feeder Breaker 2002-Q2 Complete Report
2002-EX017 ONTARIO POWER GENERATION - HYDRO OPG Nanticoke Generator Upgrades 2003-Q3 Complete Report
2002-EX018 HYDRO ONE NETWORKS INC. HYDRO ONE Fort William TS Low Voltage Reactive Compensation 2002-Q1 Complete Report
2002-EX019 HYDRO ONE NETWORKS INC. HYDRO ONE Clarke TS, Oakville TS, Centralia TS, Strathroy TS Low Voltage Reactive Compensation 2002-Q4 Complete Report
2002-EX020 HYDRO ONE NETWORKS INC. HYDRO ONE Port Hope TS & Sidney TS Special Protection System 2003-Q2 Complete Report
2002-EX021 CAMBRIDGE AND NORTH DUMFRIES HYDRO INC. CAMBRIDGE Hydro Galt TS Like for Like 2002-Q4 Complete Report
2002-EX022 HYDRO ONE NETWORKS INC. HYDRO ONE Hearn TGS Reactive Compensation 2003-Q2 Complete Report
2002-EX023 HYDRO ONE NETWORKS INC. HYDRO ONE Hearn TGS Retirement of Facilities 2002-Q2 Complete Report
2002-EX024 HYDRO ONE NETWORKS INC. HYDRO ONE Detweiler TS Like for Like 2002-Q2 Complete Report
2002-EX025 HYDRO ONE NETWORKS INC. HYDRO ONE Martindale Like for Like 2002-Q4 Complete Report
2002-EX026 HYDRO ONE NETWORKS INC. HYDRO ONE National Research TS Low Voltage Feeder Breaker 2002-Q4 Complete Report
2002-EX027 HYDRO ONE NETWORKS INC. HYDRO ONE Milltown Jct. Like for Like 2002-Q3 Complete Report
2002-EX028 INCO LIMITED, ONTARIO DIVISION INCO Copper Cliff Temporary Connections 2002-Q2 Complete Report
2002-EX029 HYDRO ONE NETWORKS INC. HYDRO ONE Hearn TGS Retirement of Facilities 2002-Q2 Complete Report
2002-EX030 HYDRO ONE NETWORKS INC. HYDRO ONE Lakeview SS Like for Like 2002-Q2 Complete Report
2002-EX031 ONTARIO POWER GENERATION - HYDRO OPGI DeCew GS Like for Like 2003-Q1 Complete Report
2002-EX032 HYDRO ONE NETWORKS INC. HYDRO ONE Detweiler TS Like for Like 2002-Q2 Complete Report
2002-EX033 HYDRO ONE NETWORKS INC. HYDRO ONE Sidney TS Like for Like 2002-Q4 Complete Report
2002-EX034 HYDRO ONE NETWORKS INC. HYDRO ONE Pickering A Like for Like 2002-Q3 Complete Report
2002-EX035 HYDRO ONE NETWORKS INC. HYDRO ONE Russell TS Like for Like 2002-Q4 Complete Report
2002-EX036 HYDRO ONE NETWORKS INC. HYDRO ONE Russell TS Like for Like 2002-Q4 Complete Report
2002-EX037 HYDRO ONE NETWORKS INC. HYDRO ONE Lincoln Heights TS Like for Like 2002-Q4 Complete Report
2002-EX038 HYDRO ONE NETWORKS INC. HYDRO ONE Fort Frances TS Like for Like 2002-Q2 Complete Report
2002-EX039 HYDRO ONE NETWORKS INC. HYDRO ONE Mackenzie TS Like for Like 2002-Q2 Complete Report
2002-EX040 HYDRO ONE NETWORKS INC. HYDRO ONE Murray TS Low Voltage Feeder Breaker 2003-Q2 Complete Report
2002-EX041 GENERAL MOTORS OF CANADA LTD. GENERAL MOTERS St. Catharines Retirement of Facilities 2002-Q3 Complete Report
2002-EX042 INCO LIMITED, ONTARIO DIVISION INCO Port Colborne New Breakers 2002-Q3 Complete Report
2002-EX043 HYDRO ONE NETWORKS INC. HYDRO ONE Leaside TS Reactive Compensation 2004-Q2 Complete Report
2002-EX044 HYDRO ONE NETWORKS INC. HYDRO ONE Elgin TS Modified Connection 2002-Q3 Complete Report
2002-EX045 HYDRO ONE NETWORKS INC. HYDRO ONE Fairchild Like for Like 2002-Q3 Complete Report
2002-EX046 HYDRO ONE NETWORKS INC. HYDRO ONE Bronte TS Low Voltage Feeder Breaker 2003-Q3 Complete Report
2002-EX047 ONTARIO POWER GENERATION - HYDRO OPG Stewartville GS Like for Like 2002-Q3 Complete Report
2002-EX048 CAMBRIDGE AND NORTH DUMFRIES HYDRO INC. CAMBRIDGE Hydro Preston TS Non-Impactive New Equipment 2002-Q3 Complete Report
2002-EX049 HYDRO ONE NETWORKS INC. HYDRO ONE Glengrove TS Like for Like 2003-Q4 Complete Report
2002-EX050 GREAT LAKES POWER - TRANSMISSION MacKay TS MacKay TS Like for Like 2002-Q3 Complete Report
2002-EX051 GREAT LAKES POWER - TRANSMISSION Third Line TS Third Line TS Like for Like 2002-Q3 Complete Report
2002-EX052 HYDRO ONE NETWORKS INC. HYDRO ONE St. Andrews TS Like for Like 2002-Q3 Complete Report
2002-EX053 HYDRO ONE NETWORKS INC. HYDRO ONE Martindale TS New Breakers 2002-Q4 Complete Report
2002-EX054 HYDRO ONE NETWORKS INC. HYDRO ONE Buchanan TS Like for Like 2002-Q4 Complete Report
2002-EX055 HYDRO ONE NETWORKS INC. HYDRO ONE Little Long GS Like for Like 2002-Q2 Complete Report
2002-EX056 HYDRO ONE NETWORKS INC. HYDRO ONE Burlington TS Like for Like 2002-Q4 Complete Report
2002-EX057 ONTARIO POWER GENERATION - HYDRO OPG Beck #2 GS Like for Like 2002-Q3 Complete Report
2002-EX058 HYDRO ONE NETWORKS INC. HYDRO ONE Norfolk TS Like for Like 2003-Q4 Complete Report
2002-EX059 HYDRO ONE NETWORKS INC. HYDRO ONE Ramore TS Like for Like 2002-Q3 Complete Report
2002-EX060 HYDRO ONE NETWORKS INC. HYDRO ONE Beach TS Like for Like 2002-Q2 Complete Report
2002-EX061 HYDRO ONE NETWORKS INC. HYDRO ONE Chesterville TS Like for Like 2002-Q4 Complete Report
2002-EX062 HYDRO ONE NETWORKS INC. HYDRO ONE Dobbin TS Like for Like 2002-Q4 Complete Report
2002-EX063 HYDRO ONE NETWORKS INC. HYDRO ONE Essa TS Like for Like 2002-Q3 Complete Report
2002-EX064 HYDRO ONE NETWORKS INC. HYDRO ONE Kenilworth TS Like for Like 2003-Q4 Complete Report
2002-EX065 HYDRO ONE NETWORKS INC. HYDRO ONE Lakeview TS Like for Like 2002-Q4 Complete Report
2002-EX066 HYDRO ONE NETWORKS INC. HYDRO ONE Glengrove TS Like for Like 2003-Q4 Complete Report
2002-EX067 HYDRO ONE NETWORKS INC. HYDRO ONE Pickering A Like for Like 2004-Q2 Complete Report
2002-EX068 HYDRO ONE NETWORKS INC. HYDRO ONE St. Marys TS Like for Like 2003-Q3 Complete Report
2002-EX069 HYDRO ONE NETWORKS INC. HYDRO ONE Windsor Crawford TS Like for Like 2002-Q3 Complete Report
2002-EX070 HYDRO ONE NETWORKS INC. Add 115 kV circuit A12N Simcoe Transmission 2009-Q2 Complete Report
2002-EX071 ENBRIDGE PIPELINES INC. ENBRIDGE Pipelines Cardinal Non-Impactive New Equipment 2003-Q1 Complete Report
2002-EX072 HYDRO ONE NETWORKS INC. HYDRO ONE Mountain Chute - Chenaux Special Protection System 2003-Q4 Complete Report
2002-EX073 HYDRO ONE NETWORKS INC. HYDRO ONE Hawthorne TS Like for Like 2004-Q4 Complete Report
2002-EX074 GREAT LAKES POWER - TRANSMISSION MacKay TS G/R MacKay TS Protection Modifications 2002-Q4 Complete Report
2002-EX075 MISSISSAGI POWER TRUST MISSISSAGI Power Trust Wells GS Like for Like 2002-Q4 Complete Report
2002-EX076 HYDRO ONE NETWORKS INC. HYDRO ONE Algoma Ts Like for Like 2003-Q3 Complete Report
2002-EX077 HYDRO ONE NETWORKS INC. HYDRO ONE Owen Sound TS Like for Like 2003-Q4 Complete Report
2002-EX078 HYDRO ONE NETWORKS INC. HYDRO ONE Riverdale TS Like for Like 2002-Q4 Complete Report
2002-EX079 HYDRO ONE NETWORKS INC. HYDRO ONE St. Thomas TS Like for Like 2002-Q4 Complete Report
2002-EX080 HYDRO ONE NETWORKS INC. HYDRO ONE Wawa TS Like for Like 2002-Q3 Complete Report
2002-EX081 HYDRO ONE NETWORKS INC. HYDRO ONE John TS Protection Modifications 2003-Q1 Complete Report
2002-EX082 HYDRO ONE NETWORKS INC. HYDRO ONE Bilberry TS Like for Like 2003-Q1 Complete Report
2002-EX083 HYDRO ONE NETWORKS INC. HYDRO ONE Leaside TS Like for Like 2002-Q4 Complete Report
2002-EX084 HYDRO ONE NETWORKS INC. HYDRO ONE Main TS Like for Like 2003-Q1 Complete Report
2002-EX085 HYDRO ONE NETWORKS INC. HYDRO ONE Manby TS Like for Like 2002-Q4 Complete Report
2002-EX086 HYDRO ONE NETWORKS INC. HYDRO ONE Richview TS Like for Like 2002-Q4 Complete Report
2002-EX087 HYDRO ONE NETWORKS INC. HYDRO ONE Toronto - Runnymede TS Like for Like 2003-Q1 Complete Report
2002-EX088 HYDRO ONE NETWORKS INC. HYDRO ONE St. Marys TS Low Voltage Feeder Breaker 2003-Q4 Complete Report
2002-EX089 HYDRO ONE NETWORKS INC. HYDRO ONE Bermondsey TS Protection Modifications 2003-Q1 Complete Report
2002-EX090 HYDRO ONE NETWORKS INC. HYDRO ONE Bridgman TS Protection Modifications 2002-Q4 Complete Report
2002-EX091 HYDRO ONE NETWORKS INC. HYDRO ONE Lambton TS Protection Modifications 2002-Q4 Complete Report
2002-EX092 HYDRO ONE NETWORKS INC. HYDRO ONE Sheppard TS Protection Modifications 2002-Q4 Complete Report
2002-EX093 HYDRO ONE NETWORKS INC. HYDRO ONE Palmerston TS Protection Modifications 2002-Q4 Complete Report
2002-EX094 ONTARIO POWER GENERATION - HYDRO OPG Chats Falls GS Like for Like 2003-Q4 Complete Report
2002-EX095 HYDRO ONE NETWORKS INC. HYDRO ONE Coniston TS Non-Impactive New Equipment 2003-Q1 Complete Report
2002-EX096 HYDRO ONE NETWORKS INC. HYDRO ONE Martindale Non-Impactive New Equipment 2002-Q4 Complete Report
2002-EX097 INCO LIMITED, ONTARIO DIVISION INCO Inco No. 4 substation Like for Like 2002-Q4 Complete Report
2002-EX098 HYDRO ONE NETWORKS INC. HYDRO ONE Scott TS Like for Like 2003-Q2 Complete Report
2002-EX099 HYDRO ONE NETWORKS INC. HYDRO ONE Albion TS Protection Modifications 2003-Q4 Complete Report
2002-EX100 HYDRO ONE NETWORKS INC. HYDRO ONE Manby TS Protection Modifications 2003-Q4 Complete Report
2002-EX101 HYDRO ONE NETWORKS INC. HYDRO ONE Kenilworth TS Protection Modifications 2003-Q4 Complete Report
2002-EX102 HYDRO ONE NETWORKS INC. HYDRO ONE Strachan TS Protection Modifications 2003-Q4 Complete Report
2002-EX103 HYDRO ONE NETWORKS INC. HYDRO ONE Goderich TS Like for Like 2003-Q3 Complete Report
2002-EX104 HYDRO ONE NETWORKS INC. HYDRO ONE Fairchild TS Like for Like 2003-Q2 Complete Report
2002-EX105 HYDRO ONE NETWORKS INC. HYDRO ONE Hearst TS Like for Like 2003-Q2 Complete Report
2002-EX106 HYDRO ONE NETWORKS INC. Hearn Demerger Hearn Modified Connection 2003-Q2 Withdrawn  
2002-EX107 HYDRO ONE NETWORKS INC. HYDRO ONE Porcupine TS Like for Like 2003-Q2 Complete Report
2002-EX108 HYDRO ONE NETWORKS INC. HYDRO ONE Sidney TS Like for Like 2003-Q3 Complete Report
2002-EX109 HYDRO ONE NETWORKS INC. HYDRO ONE Merivale TS Like for Like 2003-Q4 Complete Report
2002-EX110 HYDRO ONE NETWORKS INC. HYDRO ONE Runnymede TS Like for Like 2003-Q4 Complete Report
2002-EX111 HYDRO ONE NETWORKS INC. HYDRO ONE Mohawk TS Like for Like 2003-Q4 Complete Report
2002-EX112 HYDRO ONE NETWORKS INC. HYDRO ONE Highbury TS Like for Like 2003-Q4 Complete Report
2002-EX113 HYDRO ONE NETWORKS INC. HYDRO ONE Porcupine TS Like for Like 2003-Q2 Complete Report
2002-EX114 HYDRO ONE NETWORKS INC. HYDRO ONE Albion TS Like for Like 2003-Q2 Complete Report
2002-EX115 HYDRO ONE NETWORKS INC. HYDRO ONE Kenilowrth TS Like for Like 2003-Q3 Complete Report
2002-EX116 HYDRO ONE NETWORKS INC. HYDRO ONE Leaside TS Like for Like 2003-Q4 Complete Report
2002-EX117 HYDRO ONE NETWORKS INC. HYDRO ONE Manby TS Like for Like 2003-Q3 Complete Report
2002-EX118 HYDRO ONE NETWORKS INC. HYDRO ONE Richview TS Like for Like 2003-Q3 Complete Report
2002-EX119 HYDRO ONE NETWORKS INC. HYDRO ONE Strachan TS Like for Like 2003-Q3 Complete Report
2003-EX120 HYDRO ONE NETWORKS INC. HYDRO ONE Barrett Chute SS Non-Impactive New Equipment 2003-Q1 Complete Report
2003-EX121 HYDRO ONE NETWORKS INC. HYDRO ONE Fort Williams TS Non-Impactive New Equipment 2003-Q3 Complete Report
2003-EX122 ONTARIO POWER GENERATION - HYDRO OPG Crystal Falls GS Like for Like 2003-Q1 Complete Report
2003-EX123 HYDRO ONE NETWORKS INC. HYDRO ONE Burlington TS Reactive Compensation 2004-Q2 Complete Report
2003-EX124 HYDRO ONE NETWORKS INC. HYDRO ONE Detweiler TS Like for Like 2004-Q2 Complete Report
2003-EX125 KIMBERLY CLARK INC. TERRACE BAY MILL Terrace Bay Modified Connection 2003-Q2 Complete Report
2003-EX126 HYDRO ONE NETWORKS INC. HYDRO ONE Leaside TS Modified Connection 2003-Q4 Complete Report
2003-EX127 ONTARIO POWER GENERATION - HYDRO OPG Pine Portage GS Replacement of Generator Controls 2003-Q2 Complete Report
2003-EX128 WEYERHAEUSER COMPANY LIMITED WEYERHAEUSER Project Dryden Mill Like for Like 2003-Q2 Complete Report
2003-EX129 HYDRO ONE NETWORKS INC. HYDRO ONE Lambton TS Modified Connection 2003-Q3 Complete Report
2003-EX130 HYDRO ONE NETWORKS INC. HYDRO ONE Midhurst TS Modified Connection 2004-Q4 Complete Report
2003-EX131 HYDRO ONE NETWORKS INC. HYDRO ONE Falconbridge Modified Connection 2003-Q2 Complete Report
2003-EX132 MARKHAM HYDRO DISTRIBUTION INC. MARKHAM HYDRO Markham MTS #3 Low Voltage Reactive Compensation 2003-Q4 Complete Report
2003-EX134 HYDRO ONE NETWORKS INC. HYDRO ONE Burlington TS Like for Like 2003-Q3 Complete Report
2003-EX135 HYDRO ONE NETWORKS INC. Replacement of Equipment at Hearst TS Hearst TS Like for Like 2003-Q3 Complete Report
2003-EX136 HYDRO ONE NETWORKS INC. HYDRO ONE NE Ontarioario Retirement of Facilities   Complete Report
2003-EX137 HYDRO ONE NETWORKS INC. HYDRO ONE Kleinburg TS Low Voltage Feeder Breaker 2004-Q2 Complete Report
2003-EX138 HYDRO ONE NETWORKS INC. HYDRO ONE Wiltshire TS Like for Like 2004-Q2 Complete Report
2003-EX139 HYDRO ONE NETWORKS INC. HYDRO ONE Halton TS Low Voltage Feeder Breaker 2004-Q2 Complete Report
2003-EX140 HYDRO ONE NETWORKS INC. HYDRO ONE NW Ontarioario Non-Impactive New Equipment 2003-Q3 Complete Report
2003-EX141 HYDRO ONE NETWORKS INC. HYDRO ONE Leaside Reactive Compensation 2005-Q2 Complete Report
2003-EX142 ENBRIDGE PIPELINES INC. ENBRIDGE North Westover Non-Impactive New Equipment 2004-Q1 Complete Report
2003-EX143 HYDRO ONE NETWORKS INC. HYDRO ONE Detweiler TS Transmission 2007-Q2 Withdrawn  
2003-EX144 HYDRO ONE NETWORKS INC. HYDRO ONE Essex TS Like for Like 2003-Q3 Complete Report
2003-EX145 HYDRO ONE NETWORKS INC. HYDRO ONE London Clarke TS Additional Load 2003-Q4 Complete Report
2003-EX146 HYDRO ONE NETWORKS INC. HYDRO ONE Tilsonburg TS Like for Like 2004-Q4 Complete Report
2003-EX147 HYDRO ONE NETWORKS INC. HYDRO ONE Manby T4 Like for Like 2004-Q4 Complete Report
2003-EX148 HYDRO ONE NETWORKS INC. HYDRO ONE Ottawa Area Transmission 2004-Q2 Complete Report
2003-EX149 MARKHAM HYDRO DISTRIBUTION INC. MARKHAM HYDRO Markham MTS #1 Low Voltage Reactive Compensation 2003-Q4 Complete Report
2003-EX150 TRANSALTA ENERGY CORPORATION Sarnia - Special Protection System Sarnia Special Protection System 2003-Q3 Complete Report
2003-EX151 HYDRO ONE NETWORKS INC. HYDRO ONE Merivale TS Like for Like 2003-Q3 Complete Report
2003-EX152 HYDRO ONE NETWORKS INC. HYDRO ONE Modeland TS Like for Like 2003-Q4 Complete Report
2003-EX153 HYDRO ONE NETWORKS INC. HYDRO ONE Manby W TS Protection Modifications 2004-Q4 Complete Report
2003-EX154 HYDRO ONE NETWORKS INC. HYDRO ONE Beach TS Protection Modifications 2004-Q4 Complete Report
2003-EX155 HYDRO ONE NETWORKS INC. HYDRO ONE Richview TS Protection Modifications 2004-Q4 Complete Report
2003-EX156 ONTARIO POWER GENERATION - HYDRO OPG Beck 2 GS Like for Like 2003-Q3 Complete Report
2003-EX157 HYDRO ONE NETWORKS INC. HYDRO ONE Hawthorne TS Like for Like 2004-Q4 Complete Report
2003-EX158 HYDRO ONE NETWORKS INC. HYDRO ONE Dymond TS Like for Like 2004-Q4 Complete Report
2003-EX159 HYDRO ONE NETWORKS INC. HYDRO ONE Stayner TS Like for Like 2004-Q4 Complete Report
2003-EX160 HYDRO ONE NETWORKS INC. HYDRO ONE Ottawa Area - H9A Transmission 2004-Q4 Complete Report
2003-EX161 GREAT LAKES POWER - TRANSMISSION Gartshore #2 cct Gartshore Transmission Transmission 2004-Q4 Complete Report
2003-EX162 ONTARIO POWER GENERATION - HYDRO OPG Beck GS #2 Like for Like 2003-Q4 Complete Report
2003-EX163 HYDRO ONE NETWORKS INC. HYDRO ONE Thorton TS Protection Modifications 2003-Q4 Complete Report
2003-EX164 HYDRO ONE NETWORKS INC. HYDRO ONE Kent TS Protection Modifications 2003-Q4 Complete Report
2003-EX165 HYDRO ONE NETWORKS INC. HYDRO ONE Highbury TS Protection Modifications 2003-Q4 Complete Report
2003-EX166 HYDRO ONE NETWORKS INC. HYDRO ONE Trout Lake Protection Modifications 2003-Q4 Complete Report
2003-EX167 HYDRO ONE NETWORKS INC. HYDRO ONE Red Lake Protection Modifications 2003-Q4 Complete Report
2003-EX168 WEST WINDSOR POWER WEST WINDSOR POWER Windsor Non-Impactive New Equipment 2004-Q4 Complete Report
2003-EX169 HYDRO ONE NETWORKS INC. HYDRO ONE Various Like for Like 2004-Q4 Complete Report
2003-EX170 HYDRO ONE NETWORKS INC. HYDRO ONE Various Like for Like 2004-Q4 Complete Report
2003-EX171 HYDRO ONE NETWORKS INC. HYDRO ONE Cherrywood Like for Like 2003-Q4 Complete Report
2003-EX172 HYDRO ONE NETWORKS INC. Removal of BSPS Batteries and Chargers Various Like for Like 2004-Q4 Complete Report
2003-EX173 GREAT LAKES POWER - TRANSMISSION Gartshore Gartshore TS Transmission 2006-Q4 Complete Report
2003-EX174 FALCONBRIDGE LIMITED - ONTARIO DIVISIONS FALCONBRIDGE Sudbury New Supply Point 2004-Q3 Complete Report
2003-EX175 HYDRO ONE NETWORKS INC. HYDRO ONE Essa TS Like for Like 2003-Q4 Complete Report
2003-EX176 HYDRO ONE NETWORKS INC. Kingston-Gardiner TS Kingston New Supply Point 2009-Q2 Complete Report
Addendum 1
2003-EX177 INCO LIMITED, ONTARIO DIVISION Relocation of Transformer Frood Stobie No.2 , INCO No.4 Modified Connection 2004-Q1 Complete Report
2003-EX178 HYDRO ONE NETWORKS INC. D6 Temporary in-line Switch Chalk River TS Temporary Connections 2003-Q4 Complete Report
2003-EX179 ONTARIO POWER GENERATION - HYDRO Cameron Falls G5,G6 Refurbishment Cameron Falls GS Generator Upgrades 2004-Q2 Complete Report
2004-EX180 ONTARIO POWER GENERATION - HYDRO Arnprior GS-PSS replacement Arnprior GS Replacement of Generator Controls 2004-Q1 Complete Report
2004-EX181 GREAT LAKES POWER - TRANSMISSION Andrews DS Transformer Replacement Andrews TS Station Work 2005-Q1 Complete Report
2004-EX182 ONTARIO POWER GENERATION - HYDRO Nanticoke T5W replacement Nanticoke TGS Like for Like 2004-Q1 Complete Report
2004-EX183 HYDRO ONE NETWORKS INC. Bilberry TS LV cap replacement Bilberry TS Reactive Compensation 2004-Q4 Complete Report
2004-EX184 HYDRO ONE NETWORKS INC. Breaker Removal at Sarnia Scott Sarnia Scott TS Retirement of Facilities 2004-Q4 Complete Report
2004-EX185 HYDRO ONE NETWORKS INC. Pickering SS Pickering A & B SS Protection Modifications 2004-Q4 Complete Report
2004-EX186 GREAT LAKES POWER - TRANSMISSION Northern Ave. TS Project Sault St Marie Station Work 2005-Q1 Complete Report
2004-EX187 TRANSALTA COGENERATION LP. TransAlta Co-generation Facility-Mississauga McDonnell-Douglas New Generation   Complete Report
2004-EX188 ONTARIO POWER GENERATION - HYDRO Wawaitin GS Exciter Replacement Wawaitin GS Replacement of Generator Controls 2004-Q2 Complete Report
2004-EX189 ONTARIO POWER GENERATION - HYDRO Transformer Replacement -Nanticoke T4 Nanticoke TGS Like for Like 2004-Q1 Complete Report
2004-EX190 ONTARIO POWER GENERATION - HYDRO Beck GS Transformer Replacement Sir Adam Beck GS#2 Like for Like 2004-Q2 Complete Report
2004-EX191 HYDRO ONE NETWORKS INC. Replacement of 230 kV breaker PL562 Longwood TS Like for Like 2004-Q3 Complete Report
2004-EX192 HYDRO ONE NETWORKS INC. Madawaska Run-back Eastern Region Special Protection System   Complete Report
2004-EX193 HYDRO ONE NETWORKS INC. Transformer B-Winding Isolation Lakeview GS Modified Connection 2006-Q2 Complete Report
2004-EX194 ONTARIO POWER GENERATION - HYDRO Transformer Replacement Sir Adam Beck PGS Like for Like 2004-Q2 Complete Report
2004-EX195 ONTARIO POWER GENERATION - HYDRO Isolation of T2 at Crystal Falls GS Crystal Falls GS Modified Connection   Complete Report
2004-EX196 HYDRO ONE NETWORKS INC. Nanticoke 230 kV breaker Replacement Nanticoke TS Like for Like 2010-Q3 Complete Report
2004-EX197 HYDRO ONE NETWORKS INC. Pinard Breaker Replacement Pinard TS Like for Like 2008-Q4 Complete Report
2004-EX198 HYDRO ONE NETWORKS INC. Replace the 230kV Breaker H2L23 Manby TS Like for Like 2004-Q2 Complete Report
2004-EX199 ONTARIO POWER GENERATION - HYDRO Unavaliable Lambton GS Like for Like   Withdrawn  
2004-EX200 HYDRO ONE NETWORKS INC. Transformer Replacement Wonderland TS Like for Like 2004-Q2 Complete Report
2004-EX201 ONTARIO POWER GENERATION - HYDRO Pickering B NGS Pickering B NGS Replacement of Generator Controls   Complete Report
2004-EX202 HYDRO ONE NETWORKS INC. Hearn SS - Temporary Cables Hearn SS Modified Connection   Complete Report
2004-EX203 ABITIBI-CONSOLIDATED COMPANY OF CANADA Sturgeon Falls GS Replace Step-up Transformer Sturgeon Falls GS Like for Like 2005-Q4 Complete Report
2004-EX204 HYDRO ONE NETWORKS INC. Porcupine TS Porcupine TS Station Work 2007-Q4 Complete Report
Addendum
2004-EX205 ONTARIO POWER GENERATION - HYDRO Lambton T3 Replacement Lambton GS Like for Like 2004-Q4 Complete Report
2004-EX206 HYDRO ONE NETWORKS INC. J3E & J4E Bypass Essex TS Modified Connection 2005-Q4 Complete Report
2004-EX207 ONTARIO POWER GENERATION - HYDRO Exciter Replacement Alexander GS Alexander GS Replacement of Generator Controls 2004-Q4 Complete Report
2004-EX208 GREAT LAKES POWER - TRANSMISSION Third Line TS New 115 kV Tie Breaker Third Line TS Transmission 2005-Q4 Complete Report
2004-EX209 KESTREL POWER ENGINEERING Aubrey Falls GS Aubrey Falls GS Replacement of Generator Controls 2004-Q4 Complete Report
2004-EX210 GREAT LAKES POWER - TRANSMISSION Hollingsworth T.S. Refurbishment Sault Ste. Marie Transmission 2005-Q4 Complete Report
2004-EX211 GREAT LAKES POWER - TRANSMISSION Patrick St. TS Refurbishment Sault Ste. Marie Transmission 2006-Q3 Complete Report
2005-EX212 HYDRO ONE NETWORKS INC. Riverdale TS Ottawa Like for Like 2005-Q1 Complete Report
2005-EX213 HYDRO ONE NETWORKS INC. Guelph Cedar TS Guelph Area Low Voltage Feeder Breaker 2006-Q2 Complete Report
2005-EX214 GREAT LAKES POWER - TRANSMISSION Steelton T.S - L/R Scheme Steelton TS Special Protection System   Complete Report
2005-EX215 ONTARIO POWER GENERATION - HYDRO Rankine GS Niagara Like for Like   Complete Report
2005-EX216 HYDRO ONE NETWORKS INC. Oshawa GM TS Oshawa Modified Connection   Complete Report
2005-EX217 HYDRO ONE NETWORKS INC. 2005 Capacitor Bank Replacement Various Like for Like   Complete Report
2005-EX218 HYDRO ONE NETWORKS INC. 2005 Rod Gap Replacement Various Like for Like   Complete Report
2005-EX219 HYDRO ONE NETWORKS INC. 2005 Switch Replacement Program Various Like for Like   Complete Report
2005-EX220 HYDRO ONE NETWORKS INC. 2005 Oil Breaker Replacement Various Like for Like   Complete Report
2005-EX221 HYDRO ONE NETWORKS INC. Manby TS T13/T14 Upgrade Manby TS Additional Load   Withdrawn  
2005-EX222 HYDRO ONE NETWORKS INC. BSPS - Incorporate wind generation facilities Bruce NGS Special Protection System 2008-Q4 Complete Report
Addendum
2005-EX223 BRUCE POWER INC. Bruce B Unit refurbishments Bruce New Generation   Complete Report
2005-EX224 NORANDA INC., GECO DIVISION Manitouwadge Air Switch Installation Manitouwadge New Breakers 2005-Q2 Complete Report
2005-EX225 HYDRO ONE NETWORKS INC. Trafalgar TS Oakville Like for Like 2005-Q2 Complete Report
2005-EX226 ABITIBI-CONSOLIDATED COMPANY OF CANADA Revenue Meter Installation at Fort Frances Fort Frances Retirement of Facilities 2005-Q2 Complete Report
2005-EX227 HYDRO OTTAWA LIMITED Bridlewood 115 KV Circuit Switcher Installation 321 Eagleson Rd., Kanata New Breakers 2005-Q3 Complete Report
2005-EX228 HYDRO ONE NETWORKS INC. Transmission Station Re-Investment (ESSEX TS) ESSEX TS Non-Impactive New Equipment 2007-Q2 Complete Report
2005-EX229 HYDRO ONE NETWORKS INC. 2005 Thorold TS Switch Project (T2-K) Thorold TS Modified Connection 2005-Q2 Complete Report
2005-EX230 ONTARIO POWER GENERATION - HYDRO Power Supply to Niagara Tunnel Project Beck 2 GS Temporary Connections   Withdrawn  
2005-EX231 HYDRO ONE NETWORKS INC. Breaker replacement SC4Q at Bramalea TS Bramalea TS Like for Like   Complete Report
2005-EX232 BRUCE POWER INC. BRUCE A Transformer replacement (T6) BRUCE Like for Like 2005-Q2 Complete Report
2005-EX233 GREAT LAKES POWER - GENERATION Anjigami TS Removal of VR1 Sault Ste. Marie Station Work 2005-Q3 Complete Report
2005-EX234 HYDRO ONE NETWORKS INC. St. Isidor TS, Longueuil TS & Hawthorne TS Ontario Like for Like 2005-Q3 Complete Report
2005-EX235 KITCHENER-WILMOT HYDRO INC. Replace LV Breakers at Kitchener #5 Kitchener No.5 Like for Like 2005-Q2 Complete Report
2005-EX236 HYDRO ONE NETWORKS INC. IBP Junction - Beauharnois St. Lawrence TS Like for Like 2009-Q4 Complete Report
2005-EX237 HYDRO ONE NETWORKS INC. Replace PLC Facilties Chat Falls Like for Like 2005-Q2 Complete Report
2005-EX238 ONTARIO POWER GENERATION - HYDRO Niagara TS-25 HZ transformer removal Niagara TS Retirement of Facilities 2005-Q3 Complete Report
2005-EX239 ONTARIO POWER GENERATION - HYDRO Caribou Falls transformer upgrade Caribou Falls GS Transmission Upgrades 2006-Q2 Complete Report
2005-EX240 ONTARIO POWER GENERATION - HYDRO Caribou Falls - G2 runner upgrade Caribou Falls New Generation 2005-Q4 Complete Report
2005-EX241 HYDRO ONE NETWORKS INC. Angler Switch JCT-Circuit Switcher Angler Switch JCT New Breakers 2005-Q3 Complete Report
2005-EX242 ERCO WORLDWIDE T2 removal Sterling Pump CTS Retirement of Facilities 2005-Q3 Complete Report
2005-EX243 BROOKFIELD WIND POWER CORPORATION Clergue GS -Unit 2 Excitation/Governor Upgrade St. Mary's River - Sault Ste. Marie Generator Upgrades 2011-Q4 Complete Report
2005-EX244 HYDRO ONE NETWORKS INC. Conductor replacement Q2AH & Q5G Louth Jct to Beamsville TS Like for Like 2005-Q4 Complete Report
2005-EX245 HYDRO ONE NETWORKS INC. Installation of four new 13.8 kV feeder positions Hamilton Additional Load 2005-Q3 Complete Report
2005-EX246 HYDRO ONE NETWORKS INC. N/A Horning New Breakers   Withdrawn  
2005-EX247 BROOKFIELD WIND POWER CORPORATION Gartshore GS Transformer Replacement Gartshore Generating Station Like for Like 2005-Q4 Complete Report
2005-EX248 BROOKFIELD WIND POWER CORPORATION Andrews 115kV Substation Upgrade Montreal River - North of Sault Ste Marie Station Work 2006-Q2 Complete Report
2005-EX249 INVISTA (CANADA) COMPANY KoSa Millhaven De-registration of Transformer T2 KoSa Millhaven - Kingston Ontarioario Retirement of Facilities   Complete Report
2005-EX250 MISSISSAGI POWER TRUST Red Rock GS - Pilot Excitation System Replacement Red Rock GS Like for Like 2005-Q2 Complete Report
2005-EX251 MISSISSAGI POWER TRUST Wells GS - Excitation System Replacement Wells GS Like for Like 2005-Q2 Complete Report
2005-EX252 ONTARIO POWER GENERATION - HYDRO Lennox GS - Static Exciter Replacements G1-G4 Lennox GS Like for Like 2007-Q1 Complete Report
2005-EX253 HYDRO ONE NETWORKS INC. Two New 27.6 kV Feeder Positions Richview TS Additional Load   Complete Report
2005-EX254 HYDRO ONE NETWORKS INC. Woodroffe T4 Replacement Woodroffe TS Like for Like 2005-Q4 Complete Report
2005-EX255 ONTARIO POWER GENERATION - HYDRO Auxiliary Power Supply Pickering GS Station Work 2007-Q2 Complete Report
2005-EX256 ONTARIO POWER GENERATION - HYDRO Decew Falls GS Governor Replacement Decew Falls Generator Upgrades 2006-Q2 Complete Report
2005-EX257 HYDRO ONE NETWORKS INC. Bruce A removal of 4 switches Bruce A TS Retirement of Facilities   Complete Report
2005-EX258 HYDRO ONE NETWORKS INC. Gage TS 24-B10 & 24-B11 circuit switcher replaceme Gage TS Like for Like 2006-Q4 Complete Report
2005-EX259 HYDRO ONE NETWORKS INC. W42L / W43L Replacement Buchanan TS X Longwood TS Transmission 2008-Q4 Withdrawn  
2005-EX260 ONTARIO POWER GENERATION - HYDRO Ranney Falls Upgrade & Healey Falls GS Campbellford & Seymour Township New Generation 2010-Q1 Complete Final Report
2005-EX261 HYDRO ONE NETWORKS INC. L25N/L27N In-Line Breakers (Nova Chemical SS) L25N/L27N Right of Way at Petrosar Junction Transmission 2006-Q4 Complete Report
2005-EX262 NATIONAL RESEARCH COUNCIL NRC Breaker Replacement Ottawa Like for Like 2006-Q1 Complete Report
2005-EX263 HAMILTON SPECIALITY BAR CORP. T2 Replacement Hamilton Speciality Bar Like for Like 2006-Q1 Complete Report
2006-EX264 HYDRO ONE NETWORKS INC. 2006 Switch Replacement Program Various Like for Like 2006-Q4 Complete Report
2006-EX265 ONTARIO POWER GENERATION - HYDRO Lambton T4 Replacement Lambton GS Like for Like 2006-Q1 Complete Report
2006-EX266 HYDRO ONE NETWORKS INC. Buchanan TS - Four New Feeders Buchanan TS Additional Load 2007-Q1 Complete Final Draft Report
2006-EX267 HYDRO ONE NETWORKS INC. Birmingham T4 Replacement Birmingham TS Like for Like 2006-Q1 Complete Report
2006-EX268 HYDRO ONE NETWORKS INC. Manby TS; T5 & T6 Replacement Manby TS Like for Like 2006-Q4 Complete Report
2006-EX269 HYDRO ONE NETWORKS INC. Bronte TS Transformer Replacement Bronte TS Like for Like 2006-Q2 Complete Report
2006-EX270 HYDRO ONE NETWORKS INC. Wiltshire T1 Wiltshire TS Like for Like 2006-Q2 Complete Report
2006-EX271 HYDRO ONE NETWORKS INC. Replace End-of-Life Hanmer R9 Hanmer TS Like for Like 2007-Q3 Complete Final Draft Report
2006-EX272 HYDRO ONE NETWORKS INC. Replace Cherrywood T14 Cherrywood TS Like for Like 2007-Q4 Complete Report
2006-EX273 HYDRO ONE NETWORKS INC. Porcupine TS - Shunt Reactor Installation Porcupine TS Reactive Compensation   Withdrawn  
2006-EX276 HAMILTON SPECIALITY BAR CORP. Replace 92-HL4 & 92-HL3 Switches Hamilton Specialty Bar Like for Like 2006-Q3 Complete Report
2006-EX277 HYDRO ONE NETWORKS INC. Re-termination of 230 kV circuits E27 & M6E Essa TS Modified Connection 2007-Q3 Complete Report
2006-EX278 HYDRO ONE NETWORKS INC. Nanticoke Switch Replacement 59-N2M Nanticoke TS Like for Like 2006-Q2 Complete Report
2006-EX279 HYDRO ONE NETWORKS INC. Carlton TS - T2 & T3 Carlton TS Like for Like 2006-Q4 Complete Report
2006-EX280 HYDRO OTTAWA LIMITED Epworth TS - 58T2 Ottawa Like for Like 2007-Q4 Complete Report
2006-EX281 ONTARIO POWER GENERATION - HYDRO Mountain Chute GS- T1/T2 replacement Mountain Chute GS Like for Like 2006-Q4 Complete Report
2006-EX282 ONTARIO POWER GENERATION - HYDRO Exciter Replacement for G3&G4 at Alexander GS Alexander GS Low Voltage Reactive Compensation 2006-Q3 Complete Final Report
2006-EX283 HYDRO ONE NETWORKS INC. Q2AH / Q5G Conductor Replacement Beamsville to Hamilton Beach Transmission 2006-Q4 Complete Report
2006-EX284 WATERLOO NORTH HYDRO INC. Scheifele A TS EOL Replacements Scheifele A TS Like for Like 2006-Q3 Complete Report
2006-EX285 HYDRO ONE NETWORKS INC. 2007 Switch Replacement List Various Like for Like 2007-Q1 Complete Report
2006-EX286 HYDRO ONE NETWORKS INC. Burlington TS - T4 Replacement Burlington Like for Like 2006-Q3 Complete Report
2006-EX287 CAMBRIDGE AND NORTH DUMFRIES HYDRO INC. 4 x 27.6 kV Feeder Breakers - MTS#1 Cambridge #1 TS Low Voltage Feeder Breaker 2007-Q2 Complete Report
2006-EX289 HYDRO ONE NETWORKS INC. Capacitor Bank Replacements 2007-08 Various Like for Like 2007-Q1 Complete Final Draft Report
2006-EX290 ONTARIO POWER GENERATION - HYDRO Not used - Duplicate with 304 Abitibi Canyon GS Replacement of Generator Controls 2006-Q3 Withdrawn Report
2006-EX291 HYDRO ONE NETWORKS INC. Restring 230 kV Circuit B3N Sarnia Transmission 2006-Q4 Complete Report
2006-EX292 HYDRO ONE NETWORKS INC. Goderich T1 Replacement Goderich TS Transmission Upgrades 2006-Q3 Complete Report
2006-EX293 HYDRO ONE NETWORKS INC. Reconnect SC23 to K bus at Chatham SS Chatham SS Reactive Compensation   Complete Report
2006-EX294 BRUCE POWER INC. Bruce 5-8 Exciter Replacements Bruce GS Replacement of Generator Controls 2006-Q4 Complete Report
Addendum 1
2006-EX295 BRUCE POWER INC. Bruce Standby Generators Bruce Nuclear GS Replacement of Generator Controls 2009-Q1 Complete Final Report
Addendum 1
2006-EX296 HYDRO ONE NETWORKS INC. Replacement of 115 kV cable H3L Toronto Transmission 2009-Q1 Complete Final Draft Report
2006-EX297 HYDRO ONE NETWORKS INC. Unbundle 500 kV circuits C550V & C551V Claireville TS & Cherrywood TS Transmission 2010-Q4 Complete Report
Appendix
2006-EX298 HYDRO ONE NETWORKS INC. Burlington 2 PU Scheme Burlington TS Protection Modifications 2007-Q4 Complete Final Draft Report
2006-EX299 HYDRO ONE NETWORKS INC. New T6 & 230/115 kV Equipment at Burlington TS Burlington TS Station Work 2012-Q4 Complete Final Draft Report
Addendum 1
2006-EX300 HYDRO ONE NETWORKS INC. Niagara Murray - New Metal Clad Switchgear Niagara Murray TS Like for Like 2007-Q1 Complete Report
2006-EX301 HYDRO ONE NETWORKS INC. Chats Falls - Switch Replacement Chat Falls TS Like for Like 2007-Q3 Complete Final Draft Report
2006-EX302 HYDRO ONE NETWORKS INC. Duplex TS - Circuit Switcher Replacement Duplex TS Like for Like 2008-Q2 Complete Draft Report
2006-EX303 POWERSTREAM INC. Vaughn MTS #1 - T1 & T2 Switch Replacement Vaughn MTS #1 Like for Like 2007-Q2 Complete Final Report
2006-EX304 ONTARIO POWER GENERATION - HYDRO Abitibi Canyon GS - G5 Exciter & Runner Upgrade Abitibi Canyon GS Generator Upgrades 2006-Q4 Complete Report
2006-EX305 GREAT LAKES POWER - TRANSMISSION Andrews 115 kV Switch Andrews TS Modified Connection 2006-Q4 Complete Report
2006-EX306 HYDRO ONE NETWORKS INC. Nelson T4 Replacement Nelson TS Like for Like 2006-Q4 Complete Report
2006-EX307 HYDRO ONE NETWORKS INC. Beauharnois G/R Modifications St. Lawrence TS Special Protection System   Withdrawn  
2006-EX308 HYDRO ONE NETWORKS INC. Bronte TS 27.6 kV Bus tie connection / Feeders Bronte TS Station Work 2008-Q2 Complete Final Draft Report
2006-EX309 HYDRO ONE NETWORKS INC. Replace Cecil T2 Toronto Transmission Upgrades 2006-Q4 Complete Report
2006-EX310 ONTARIO POWER GENERATION - HYDRO Nanticoke G5&G6 Turbine Upgrades Nanticoke GS New Generation 2007-Q4 Complete Report
2006-EX311 TECK-CORONA New 138 kV CB at Teck-Corona David Bell Mine Marathon Like for Like 2007-Q2 Complete Report
2006-EX312 ONTARIO POWER GENERATION - HYDRO Nanticoke T5 - R & B Replacements Nanticoke GS Like for Like 2006-Q4 Complete Report
2006-EX313 GREAT LAKES POWER - TRANSMISSION 3rd Line TS - T1 Replacement Sault Ste. Marie Transmission Upgrades 2007-Q4 Complete Report
2006-EX314 WATERLOO NORTH HYDRO INC. Eby Rush TS - Upgrade 2 Transformers Eby Rush TS, Waterloo Transmission Upgrades 2010-Q1 Complete Final Report
Addendum 1
2007-EX315 ONTARIO POWER GENERATION - HYDRO Decew Falls Unit 2 Upgrade Southwest New Generation 2007-Q2 Complete Report
2007-EX316 ONTARIO POWER GENERATION - HYDRO Cameron G3&G4 Runner Upgrades Cameron Falls GS New Generation 2008-Q2 Complete Final Report

2007-EX317 BROOKFIELD WIND POWER CORPORATION Clergue GS units 1 and 3 Clergue GS Generator Upgrades 2007-Q2 Complete Report
2007-EX318 HYDRO ONE NETWORKS INC. Install LV Shunt Capacitor at Belle River Belle River TS Station Work 2008-Q1 Complete Final Draft Report
2007-EX319 LAFARGE NORTH AMERICA Replace T1 at Lafarge Bath CTS East Like for Like 2007-Q1 Complete Report
2007-EX320 HYDRO ONE NETWORKS INC. Wilhaven DS Upgrade Wilhaven, ON Transmission Upgrades 2007-Q2 Complete Final Report
2007-EX321 GREAT LAKES POWER - TRANSMISSION Third Line TS 115 kV Refurbishment Third Line TS Like for Like 2009-Q4 Complete Final Report
2007-EX322 GREAT LAKES POWER - TRANSMISSION MacKay TS 115 kV Refurbishment Sault Ste. Marie Like for Like 2008-Q3 Complete Final Report
2007-EX323 GREAT LAKES POWER - TRANSMISSION Magpie TS Protection Refurbishment Sault Ste. Marie Protection Modifications 2007-Q4 Withdrawn  
2007-EX324 MISSISSAGI POWER TRUST Aubrey G2 Exciter Replacement NW Replacement of Generator Controls 2007-Q2 Complete Report
2007-EX325 HYDRO ONE NETWORKS INC. Pinard T1 Replacement North East Transmission Upgrades 2007-Q2 Complete Final Draft Report
2007-EX326 ONTARIO POWER GENERATION - HYDRO Abitibi G3G4 Upgrades Northwest New Generation 2007-Q2 Withdrawn  
2007-EX327 HYDRO ONE NETWORKS INC. B5D-Q Switch Replacement On B5D line near Quebec Like for Like 2007-Q2 Complete Report
2007-EX328 HYDRO ONE NETWORKS INC. Lambton 230 kV switchyard upgrade Lambton TS Station Work 2011-Q3 Complete Final Draft Report
2007-EX329 ONTARIO POWER GENERATION - HYDRO Abitibi Cayon G2&G3 Upgrades Northwest Transmission Upgrades 2007-Q2 Complete Report
2007-EX330 HYDRO ONE NETWORKS INC. Replace Failed Bramalea T1 with System Spare Bramalea Like for Like 2007-Q2 Complete Final Draft Report
2007-EX331 HYDRO ONE NETWORKS INC. New 115 kV MSO style switch on L7S West of Portland Jct Non-Impactive New Equipment 2007-Q2 Complete Final Draft Report
2007-EX333 HYDRO ONE NETWORKS INC. Installation of LV Shunt Capacitor at Whitby TS #1 Whitby TS #1 Reactive Compensation 2008-Q2 Complete Final Draft Report
2007-EX334 WESDOME GOLD MINES LTD. Eagle River Mine T1 Replacement Steephill Falls Transmission Upgrades 2007-Q2 Complete Final Report
2007-EX335 HYDRO ONE NETWORKS INC. Weston Lake DS Refurbishment Ottawa Transmission Upgrades 2007-Q2 Complete Final Report
2007-EX336 MISSISSAGI POWER TRUST Scott GS Excitation Upgrade Scott GS Replacement of Generator Controls 2007-Q4 Complete Final Report
2007-EX337 HYDRO ONE NETWORKS INC. 2007 Switch Replacement Program - 3 added switches Various Like for Like   Withdrawn  
2007-EX338 GREAT LAKES POWER - TRANSMISSION New 115kV Line Disconnect Switch on Steephill Line Northeast Non-Impactive New Equipment 2007-Q3 Complete Final Report
2007-EX339 HYDRO ONE NETWORKS INC. Stayner TS SC2 Shunt Cap Retirement Stayner TS Retirement of Facilities 2009-Q2 Complete Final Draft Report
2007-EX340 HYDRO ONE NETWORKS INC. Replace Glengrove T3 Glengrove TS Like for Like 2007-Q3 Complete Final Draft Report
2007-EX341 HYDRO ONE NETWORKS INC. Replace SC22A at Richview TS Richview TS Like for Like 2007-Q3 Complete Final Draft Report
2007-EX342 GREAT LAKES POWER - TRANSMISSION MacKay TS No.3 Sault G/R Scheme MacKay TS Special Protection System 2009-Q4 Complete Final Report
2007-EX343 HYDRO OTTAWA LIMITED Marchwood MTS Refurbishment Marchwood MTS Station Work 2008-Q2 Complete Final Report
2007-EX344 HYDRO ONE NETWORKS INC. Caledonia TS New Feeder Breaker Position Caledonia TS Low Voltage Feeder Breaker 2008-Q2 Complete Final Draft Report
2007-EX345 ABITIBI-CONSOLIDATED COMPANY OF CANADA West Coast Energy New AVR Fort Frances Replacement of Generator Controls 2008-Q2 Complete Final Report
2007-EX346 HYDRO ONE NETWORKS INC. New 230 kV Disconnect Switches at Pinard TS Pinard TS Non-Impactive New Equipment 2009-Q4 Complete Final Draft Report
2007-EX347 HYDRO ONE NETWORKS INC. Remove idle section of L5H North Bay Transmission 2008-Q4 Complete Final Draft Report
2007-EX348 NIAGARA-ON-THE-LAKE HYDRO INC. New 115 kV Circuit Switchers at NOTL MTS#2 Niagara on the Lake Non-Impactive New Equipment 2008-Q2 Complete Final Report
2007-EX349 HYDRO ONE NETWORKS INC. BSPS modifications Bruce B SS and various TSs Special Protection System 2008-Q4 Complete Final Draft Report
2007-EX350 HYDRO ONE NETWORKS INC. New 44 kV Feeder at Kleinburg TS Kleinburg TS Low Voltage Feeder Breaker 2008-Q2 Complete Final Draft Report
2007-EX351 BRUCE POWER INC. Bruce U5 & U7 exciter replacements Bruce B Replacement of Generator Controls   Withdrawn  
2007-EX352 MISSISSAGI POWER TRUST T27 & T28 Transformer Replacements at Wells GS Wells GS Transmission Upgrades 2008-Q2 Complete Final Report
2007-EX353 NORFOLK POWER DISTRIBUTION INC. A12N Tap to Bloomsburg MTS Bloomsburg MTS Modified Connection 2009-Q2 Complete Final Draft Report
2007-EX354 LAKE SUPERIOR POWER LIMITED PARTNERSHIP Exciter Replacement - Lake Superior GS Lake Superior GS Replacement of Generator Controls 2007-Q4 Complete Final Report
2007-EX355 HYDRO ONE NETWORKS INC. Remove idle sections of 230 kV B20P and B24P Port Elgin Transmission 2008-Q4 Complete Final Draft Report
2007-EX356 HYDRO ONE NETWORKS INC. Remove idle section of 115 kV T2R Falconbridge Transmission 2008-Q4 Complete Final Draft Report
2007-EX357 ONTARIO POWER GENERATION - HYDRO Nanticoke T6R & T6B Replacements Nanticoke GS Like for Like 2007-Q4 Complete Final Report
2007-EX358 HYDRO ONE NETWORKS INC. Navan DS Redevelopment Navan DS Modified Connection 2008-Q3 Complete Final Draft Report
2007-EX359 HYDRO ONE NETWORKS INC. Decommission R27-S & R76-S Sir Adam Beck 2 Modified Connection 2012-Q4 Complete Final Report
2007-EX360 HYDRO ONE NETWORKS INC. Longlac TS - Refurbish 115-44 kV TS Longlac TS Modified Connection 2011-Q4 Complete Final Draft Report
2007-EX361 HYDRO ONE NETWORKS INC. 2008 Switch Replacement List Various Non-Impactive New Equipment 2008-Q4 Complete Final Draft Report
2007-EX362 HYDRO ONE NETWORKS INC. Replace Circuit Switchers K1G & K2G at Gage TS Gage TS Like for Like 2008-Q4 Complete Final Draft Report
2007-EX363 BROOKFIELD POWER Governor replacement at Hollingsworth GS Hollingsworth GS Replacement of Generator Controls 2007-Q4 Complete Final Report
2007-EX364 HYDRO ONE NETWORKS INC. L1S Section Replacement Between Coniston TS and Sudbury Jct Transmission 2009-Q2 Complete Final Draft Report
2007-EX365 HYDRO ONE NETWORKS INC. L23N, V41N and V43N phase reconfiguration H-frame structures north of Lasalle Road Transmission 2009-Q4 Complete Final Draft Report
2007-EX366 HYDRO ONE NETWORKS INC. Monteith DS - T1 Transformer Replacement Monteith DS Like for Like 2007-Q4 Complete Final Draft Report
2007-EX367 HYDRO ONE NETWORKS INC. Replace transformers at Woodroffe TS Woodroffe TS Non-Impactive New Equipment 2010-Q2 Complete Final Report
2007-EX368 HYDRO ONE NETWORKS INC. New T5 at Erindale TS Erindale TS Non-Impactive New Equipment 2008-Q4 Complete Final Draft Report
2007-EX369 HYDRO ONE NETWORKS INC. Replace T2 & T3 at Birmingham TS Birmingham TS Like for Like 2009-Q1 Complete Final Draft Report
2007-EX370 ABITIBI CONSOLIDATED HYDRO LTD PARTNERSHIP Replace Exciter and Controls at Calm Lake GS Abitibi Calm lake GS Replacement of Generator Controls 2008-Q1 Complete Final Report
2007-EX371 ABITIBI CONSOLIDATED HYDRO LTD PARTNERSHIP Replace Exciter and Controls at Sturgeon Falls Abitibi Sturgeon Falls CGS Replacement of Generator Controls 2008-Q1 Complete Final Report
2007-EX372 ONTARIO POWER GENERATION - HYDRO Return of Thunder Bay C1 Thunderbay Modified Connection 2008-Q1 Complete Final Report
2007-EX373 NORTHLAND POWER INC. Upgrade AVR on Cochrane G1 & G2 Cochrane GS Replacement of Generator Controls 2007-Q4 Complete Draft Report
2008-EX374 ONTARIO POWER GENERATION - HYDRO Replace G4T & G5T at Stewartville GS Stewartville GS Like for Like 2008-Q2 Withdrawn  
2008-EX375 KENORA HYDRO ELECTRIC CORP LTD. Replace T2 at Kenora MTS Kenora MTS Like for Like 2008-Q1 Complete Final Report
2008-EX376 HYDRO ONE NETWORKS INC. Interim S3S/S4S Reconfiguration Smokey Falls Temporary Connections 2008-Q1 Complete Final Draft Report
Diagram 1
2008-EX377 BROOKFIELD POWER Upgrade Mackay GS Unit 3 Excitation Mackay GS Replacement of Generator Controls 2008-Q4 Complete Final Report
2008-EX379 HYDRO ONE NETWORKS INC. Q5G Removal at Beck SS#1 Beck SS#1 Modified Connection 2008-Q4 Complete Final Draft Report
2008-EX380 GREAT LAKES POWER - TRANSMISSION Third Line TS Voltage Study Third Line TS Special Protection System 2009-Q4 Complete Final Report
2008-EX381 HYDRO ONE NETWORKS INC. New 115 kV switch on L7S at St. Mary's Cement CTS St. Mary's Cement CTS Non-Impactive New Equipment 2010-Q4 Complete Final Draft Report
2008-EX382 ONTARIO POWER GENERATION - HYDRO AVR Replacements at Chenaux GS Chenaux GS Replacement of Generator Controls 2009-Q1 Complete Final Report
2008-EX383 CANADIAN HYDRO DEVELOPERS INC. T1 Replacement at Amaranth CTS Amaranth CTS Like for Like 2008-Q2 Complete Final Report
2008-EX384 HYDRO ONE NETWORKS INC. 2008 Breaker Replacements Various Like for Like 2008-Q4 Complete Final Draft Report
2008-EX385 HYDRO ONE NETWORKS INC. Stayner L/R Removal Stayner TS Special Protection System 2009-Q2 Complete Final Draft Report
2008-EX386 HYDRO ONE NETWORKS INC. Hanlon TS Feeder Breakers Hanlon TS Low Voltage Feeder Breaker 2009-Q4 Complete Final Draft Report
2008-EX387 HYDRO ONE NETWORKS INC. Hanmer R6 Replacement Hanmer TS Like for Like 2008-Q3 Complete Final Draft Report
2008-EX388 ONTARIO POWER GENERATION - HYDRO Decew Falls #2 G1 Pilot Exciter Replacement Decew Falls #2 GS Replacement of Generator Controls 2009-Q1 Complete Final Report
2008-EX389 HYDRO ONE NETWORKS INC. Ardoch DS Refurbishment/Transformer Replacement Ardoch DS Non-Impactive New Equipment 2008-Q2 Complete Final Draft Report
2008-EX390 HYDRO ONE NETWORKS INC. Hearst TS Refurbishment Hearst TS Like for Like 2008-Q3 Complete Final Draft Report
2008-EX391 HYDRO ONE NETWORKS INC. Highbury New T4 Highbury Like for Like 2009-Q4 Complete Final Draft Report
2008-EX392 HYDRO ONE NETWORKS INC. Glengrove new T1 and T4 Glengrove TS Like for Like 2009-Q4 Complete Final Report
2008-EX393 HYDRO ONE NETWORKS INC. Orangeville TS new T3-H & T4-A Orangeville TS Like for Like 2008-Q2 Complete Final Draft Report
2008-EX394 HYDRO ONE NETWORKS INC. Cedar TS SC1 Replacement Cedar TS Like for Like   Withdrawn  
2008-EX395 HYDRO ONE NETWORKS INC. Beamsville T3 and T4 replacement Beamsville TS Like for Like 2008-Q4 Complete Final Draft Report
2008-EX396 LAKE SUPERIOR POWER LIMITED PARTNERSHIP Lake Superior Power STG1 Exciter Replacement Lake Superior Power Replacement of Generator Controls 2008-Q3 Complete Final Report
2008-EX397 HYDRO ONE NETWORKS INC. Replace Buchanan SC11SC breaker Buchanan TS Like for Like 2008-Q4 Complete Final Draft Report
2008-EX398 HYDRO ONE NETWORKS INC. Replace Hearn SC12A breaker Hearn SS Like for Like 2008-Q3 Complete Final Draft Report
2008-EX399 HYDRO ONE NETWORKS INC. Replace Failed Alliston T3 with System Spare Alliston TS Like for Like 2008-Q3 Complete Final Draft Report
2008-EX400 FIVE NATIONS ENERGY INC. Kashechewan 2nd Transformer Installation Kashechewan, ON Station Work 2009-Q2 Complete Final Report
2008-EX401 ONTARIO POWER GENERATION - HYDRO Pine Portage GS G1 & G2 Protection Changes Pine Portage GS Standard Protection Equipment Replacements 2008-Q3 Complete Final Report
2008-EX402 ONTARIO POWER GENERATION - HYDRO Whitedog Falls T1 Protection Changes Whitedog Falls GS Like for Like 2008-Q4 Complete Final Report
2008-EX403 HYDRO ONE NETWORKS INC. Replace failed Keith T23 with system spare Keith TS Like for Like 2008-Q4 Complete Final Draft Report
2008-EX404 HYDRO ONE NETWORKS INC. Replace failed Alliston T4 with system spare Alliston TS Like for Like 2008-Q3 Complete Final Draft Report
2008-EX405 HYDRO ONE NETWORKS INC. Replace failed Cherrywood T16 Cherrywood TS Like for Like 2008-Q4 Complete Final Draft Report
2008-EX406 HYDRO ONE NETWORKS INC. Q4N Conductor Relocation Between Adam Beck GS1 and Stanley TS Transmission Upgrades 2009-Q2 Complete Final Draft Report
2008-EX407 ONTARIO POWER GENERATION - HYDRO Protection Changes for C27P at Arnprior GS Arnprior GS Protection Modifications 2008-Q4 Complete Final Report
2008-EX408 HYDRO ONE NETWORKS INC. Elliot Lake new T3 Elliot Lake TS Like for Like 2009-Q3 Complete Final Draft Report
2008-EX409 HYDRO ONE NETWORKS INC. 2009 Switch replacement list Various Like for Like 2009-Q4 Complete Final Draft Report
2008-EX410 HYDRO ONE NETWORKS INC. Longwood R4N & R5N; Hawthorne R2N replacements Various Like for Like   Complete Final Draft Report
2008-EX411 HYDRO ONE NETWORKS INC. Glengrove TS new feeder breakers T1 & T3 Glengrove TS Low Voltage Feeder Breaker 2009-Q2 Complete Draft Report
2008-EX412 GEORGIA PACIFIC THOROLD GP Thorold new switcher and protection changes GP Thorold mill 121 kV substation Non-Impactive New Equipment 2009-Q2 Complete Final Report
2008-EX413 ONTARIO POWER GENERATION - HYDRO Beck 1 Governor Replacements Sir Adam Beck 1 GS Replacement of Generator Controls 2011-Q1 Complete Final Report
2008-EX414 XSTRATA NICKEL Onaping Area #1 SS - new circuit switchers Onaping Area #1 SS Modified Connection 2010-Q3 Complete Final Report
2008-EX415 NORFOLK POWER DISTRIBUTION INC. New T2 at Bloomsburg MTS Bloomsburg MTS Modified Connection 2009-Q4 Complete Final Report
2008-EX416 ONTARIO POWER GENERATION - HYDRO Pine Portage GS G3 & G4 Protection Changes Pine Portage GS Standard Protection Equipment Replacements 2009-Q1 Complete Final Report
2008-EX417 ONTARIO POWER GENERATION - HYDRO Replace T1 to T4 at Des Joachims GS Des Joachims GS Like for Like 2013-Q4 Complete Final Report
2008-EX418 ONTARIO POWER GENERATION - HYDRO Replace T1 & T2 at Otto Holden GS Otto Holden GS Like for Like 2010-Q3 Complete Final Report
2009-EX419 ONTARIO POWER GENERATION - HYDRO Protection changes for T1 & T2 at Otter Rapids GS Otter Rapids GS Protection Modifications 2009-Q3 Complete Final Report
2009-EX420 HYDRO ONE NETWORKS INC. New in-line switch on Q2AH Near Holland Rd JCT Non-Impactive New Equipment 2009-Q1 Complete Final Draft Report
2009-EX421 HYDRO ONE NETWORKS INC. Replace four 230 kV breakers at Pickering A SS Pickering A SS Non-Impactive New Equipment 2012-Q2 Complete Final Report
2009-EX422 HYDRO ONE NETWORKS INC. P3S refurbishment Dobbin TS to Sidney TS Transmission Upgrades 2010-Q4 Complete Final Report
2009-EX423 GREAT LAKES POWER - GENERATION Gartshore G1 Exciter and Governor upgrades Gartshore GS Replacement of Generator Controls 2009-Q3 Complete Final Report
2009-EX424 BROOKFIELD RENEWABLE POWER INC. Aubrey Falls GS - Generator upgrades Aubrey Falls GS New Generation 2010-Q4 Complete Final Report
2009-EX425 HYDRO ONE NETWORKS INC. Gage TS new A4-A5 & H2-H3 switches Gage TS Station Work 2009-Q3 Complete Final Draft Report
2009-EX426 HYDRO ONE NETWORKS INC. Refurbish North Bay TS North Bay TS Transmission Upgrades 2012-Q4 Complete Final Report
2009-EX427 HYDRO ONE NETWORKS INC. New In-Line switches on H9A Near Hawthorne TS Transmission   Complete Final Draft Report
2009-EX428 TRANSCANADA PIPELINES LTS. Shannonville Compressor Station 139 Upgrade Shannonville, ON Like for Like 2009-Q3 Complete Final Report
2009-EX429 HYDRO ONE NETWORKS INC. Replace disconnect switches at Nanticoke TS Nanticoke TS Station Work 2010-Q3 Complete Final Draft Report
2009-EX430 HYDRO ONE NETWORKS INC. Wawa R1 Reactor Replacement Wawa Station Work 2009-Q1 Complete Final Draft Report
2009-EX431 ERIE SHORES WIND FARM LTD PARTNERSHIP Revise line protections on T11T T11T Protection Modifications   Complete Final Report
2009-EX432 HYDRO ONE NETWORKS INC. Replace T8 at Porcupine TS Porcupine TS Like for Like 2009-Q3 Complete Final Report
2009-EX433 ONTARIO POWER GENERATION - HYDRO Mountain Chute G2 Exciter Replacement Mountain Chute GS Replacement of Generator Controls 2010-Q2 Complete Final Report
2009-EX434 KENORA HYDRO ELECTRIC CORP LTD. Kenora MTS rebuild Kenora MTS Modified Connection 2009-Q3 Complete Final Report
2009-EX435 VALE INCO LTD. New tie disconnect at Copper Cliff CTS4 Inco #4 CTS Like for Like 2009-Q3 Complete Final Report
2009-EX436 TRANSALTA GENERATION PARTNERSHIP Upgrade GT at TA Windsor Windsor Transalta CGS West New Generation 2009-Q3 Complete Final Report
2009-EX437 ONTARIO POWER GENERATION - HYDRO Harmon GS Tansformer Replacement Harmon GS Like for Like 2009-Q3 Complete Final Report
2009-EX438 FORD MOTOR COMPANY OF CANADA, LIMITED Replace disconnect switch Ford Oakville Like for Like   Withdrawn  
2009-EX439 WATERLOO NORTH HYDRO INC. Schiefele A Protection System upgrade Scheifele A MTS Protection Modifications 2009-Q2 Complete Final Report
2009-EX440 TRANSCANADA PIPELINES LTS. Grafton Compressor Station 136 Upgrade Grafton, Ontario New Breakers 2009-Q3 Complete Final Report
2009-EX441 HYDRO ONE NETWORKS INC. New Keewatin DS NW of Kenora New Supply Point 2012-Q4 Complete Final Report
2009-EX442 ENBRIDGE PIPELINES INC. New circuit switchers at Keyser & Bryanston Keyser & Bryanston facilites Station Work 2009-Q3 Complete Final Report
2009-EX443 ONTARIO POWER GENERATION - HYDRO New T2 at Manitou Falls GS Manitou Falls GS Like for Like 2009-Q3 Complete Final Report
2009-EX444 HYDRO ONE NETWORKS INC. Beamsville TS Mobile Cap Bank Removal Beamsville TS Low Voltage Reactive Compensation 2010-Q1 Complete Final Report



2009-EX445 HYDRO ONE NETWORKS INC. Petawawa DS New T1 and T2 Petawawa DS Like for Like 2009-Q3 Complete Final Report
2009-EX446 GREAT LAKES POWER - TRANSMISSION Third Line TS Tertiary Series Reactor project Third Line TS Low Voltage Reactive Compensation 2010-Q1 Complete Final Report
2009-EX447 HYDRO ONE NETWORKS INC. Install Current Limiting Reactors at Jarvis TS Jarvis TS Non-Impactive New Equipment 2010-Q3 Complete Final Report
2009-EX448 HYDRO ONE NETWORKS INC. Kenora Power/Angle Relay deregistration Kenora TS Retirement of Facilities 2010-Q2 Complete Final Report
2009-EX449 TRANSALTA GENERATION PARTNERSHIP Upgrades at Transalta Mississauga Mississauga New Generation 2009-Q3 Complete Final Report
2009-EX450 BROOKFIELD RENEWABLE POWER INC. Hollingsworth G1 Stator Rewind Hollingsworth GS New Generation 2009-Q4 Complete Final Report
2009-EX451 HYDRO ONE NETWORKS INC. 2010 Replacement Capacitor Banks Various Like for Like 2010-Q4 Complete Final Report
2009-EX452 HYDRO ONE NETWORKS INC. Leaside T19, T20 & T21 Replacements Leaside TS Like for Like 2011-Q4 Complete Final Report
2009-EX453 HYDRO ONE NETWORKS INC. 2010 Breaker Replacements Various Like for Like 2010-Q4 Complete Final Report
2009-EX454 HYDRO ONE NETWORKS INC. A1B protection upgrades 115 kV Circuit A1B Protection Modifications 2009-Q4 Complete Final Report
2009-EX455 BARRICK GOLD CORP - WILLIAMS MINE New disconnect switch at David Bell mine Off M2W Like for Like 2009-Q4 Complete Final Report
2009-EX456 HYDRO ONE NETWORKS INC. Lennox X21 X22 LEO X21, X22 Protection Modifications 2012-Q3 Complete Final Report
2009-EX457 HYDRO ONE NETWORKS INC. Replacement of H2JK and K6J cables Strachan TS x Riverside Jct Like for Like 2014-Q4 Complete Final Report

2009-EX458 HYDRO ONE NETWORKS INC. Add Surge Capacitors, Breakers & Interruptors Various Non-Impactive New Equipment 2010-Q2 Complete Final Report
2009-EX459 HYDRO ONE NETWORKS INC. SVC conn equipment at Porcupine & Kirkland Lake Porcupine TS & Kirkland Lake TS Non-Impactive New Equipment 2010-Q4 Complete Final Report
2009-EX460 HYDRO ONE NETWORKS INC. 125 MVA Transformer replacements Various Like for Like 2013-Q3 Complete Final Report
2009-EX461 HYDRO ONE NETWORKS INC. 2010 SF6 Breaker Replacements Various Like for Like 2010-Q4 Complete Final Report
2009-EX462 HYDRO ONE NETWORKS INC. 115 kV Line ground disconnect switch at Stayner TS Stayner TS Like for Like 2011-Q4 Complete Final Report
2010-EX463 HYDRO ONE NETWORKS INC. Replace SC21 and SC22 breakers Richview TS Like for Like   Withdrawn  
2010-EX464 HYDRO ONE NETWORKS INC. Lennox Manual DC transfer scheme Lennox TS Protection Modifications 2014-Q1 Complete Final Report
2010-EX465 HYDRO ONE NETWORKS INC. Disconnect Switch Replacements and Refurbishments Various Like for Like 2013-Q4 Complete Addendum 1
2010-EX466 ONTARIO POWER GENERATION - HYDRO Mountain Chute G2 rewind and exciter replacement Mountain Chute GS Replacement of Generator Controls 2010-Q4 Complete Report
2010-EX467 BROOKFIELD RENEWABLE POWER INC. Clergue T3 Transformer Replacement Clergue GS Like for Like 2010-Q3 Complete Final Report
2010-EX468 ONTARIO POWER GENERATION - HYDRO Replacement T3 at Abitibi Canyon GS Abitibi Canyon GS Like for Like 2010-Q3 Complete Final Report
2010-EX469 WATERLOO NORTH HYDRO INC. Upgrade HV equipment at Eby Rush TS Eby Rush TS Non-Impactive New Equipment 2010-Q4 Complete Final Report
2010-EX470 HYDRO ONE NETWORKS INC. Hawthorne TS Capacitor Switching Scheme Hawthorne TS Protection Modifications   Complete Final Report
2010-EX471 ONTARIO POWER GENERATION - HYDRO Cameron Falls G7 Exciter Replacement Cameron Falls GS Replacement of Generator Controls 2010-Q2 Complete Final Report
2010-EX472 HYDRO ONE NETWORKS INC. New disconnect switch (K38S) at Kapuskasing TS Kapuskasing TS Modified Connection   Withdrawn  
2010-EX473 HYDRO ONE NETWORKS INC. Uprating of F11C/F12C Guelph Cedar TS to Freeport SS Transmission Upgrades 2010-Q4 Complete Final Report
2010-EX474 HYDRO ONE NETWORKS INC. Remove T2L1 at Crystal Falls SS Crystal Falls SS Station Work   Complete Final Report
2010-EX475 ONTARIO POWER GENERATION - HYDRO Stewartville G4 exciter replacement Stewartville GS Like for Like   Complete Final Report
2010-EX476 HYDRO ONE NETWORKS INC. Wawa R2 Reactor Replacement Wawa TS Like for Like   Complete Final Report
2010-EX477 TRANSALTA CORPORATION Replace exciter on TG-821 Sarnia Replacement of Generator Controls 2011-Q4 Complete Final Report
2010-EX478 BROOKFIELD POWER Shekak G1 rewind near Hurst, ON Like for Like 2010-Q2 Complete Final Report
2010-EX479 HYDRO ONE NETWORKS INC. Leaside TS Uprate SC Capability Leaside TS Station Work 2012-Q4 Complete Final Report
2010-EX480 HYDRO ONE NETWORKS INC. Manby TS Uprate SC Capability Manby TS Station Work 2014-Q4 Complete Final Report
2010-EX481 ONTARIO POWER GENERATION - HYDRO Mountain Chute G1 rewind Mountain Chute GS Generator Upgrades   Complete Final Report
2010-EX482 ONTARIO POWER GENERATION - HYDRO Alexander G5 Upgrade Alexander GS Generator Upgrades 2010-Q4 Complete Final Report
2010-EX483 HYDRO ONE NETWORKS INC. Sioux Narrows DS Refurbishment Sioux Narrows, ON Station Work 2012-Q4 Complete Final Report
2010-EX484 HYDRO ONE NETWORKS INC. Replace Manotick T2 Manotick DS Like for Like 2011-Q2 Complete Final Report
2010-EX485 HYDRO ONE NETWORKS INC. North Shore DS Refurbishment North Shore DS Station Work 2010-Q4 Complete Final Report
2010-EX486 HYDRO ONE NETWORKS INC. Protection Changes on B3N Between Bunce Creek TS & Scott TS Protection Modifications 2010-Q3 Complete Final Report
2010-EX487 VALE INCO LTD. New HV equipment at Copper Cliff SS Copper Cliff CTS Like for Like 2012-Q3 Complete Final Report
2010-EX488 LAKE HURON PRIMARY WATER SUPPLY SYSTEM Replace circuit switcher Lake Huron Water Treatment Plant Like for Like 2011-Q2 Complete Final Report
2010-EX489 HYDRO ONE NETWORKS INC. Remove PSVR harware assoc w BSPS Bruce B SS Protection Modifications 2010-Q2 Complete Final Report
2010-EX490 HYDRO ONE NETWORKS INC. Uprate A6P between Reserve Jct and Port Arthur TS Transmission Upgrades 2012-Q3 Complete Final Report
2010-EX491 HYDRO ONE NETWORKS INC. Replace failed Beck R76 with larger unit Niagara Falls Like for Like 2012-Q4 Complete Final Report
2010-EX492 HYDRO ONE NETWORKS INC. Replace Reactors at Pinard, Hanmer and Kenora Various Low Voltage Reactive Compensation 2011-Q1 Complete Final Report
2010-EX493 HYDRO ONE NETWORKS INC. Spence Wind Farm SS near Chatham, ON Modified Connection 2010-Q4 Complete Final Report
2010-EX494 HYDRO ONE NETWORKS INC. Install 2 ohm bus tie reactor at Walker #1 TS Walker #1 TS Low Voltage Reactive Compensation 2010-Q3 Complete Final Report
2010-EX495 KIEWIT ALARIE PARTNERSHIP Temproray Construction Power at Smoky Falls GS Smoky Falls SS Temporary Connections 2010-Q4 Complete Final Report
2010-EX496 XSTRATA NICKEL Replace disconnect switch at Falconbridge smelter Falconbridge smelter Like for Like 2010-Q2 Complete Final Report
2010-EX497 ONTARIO POWER GENERATION - HYDRO R21D A Protection Upgrade at Abitibi Canyon GS Abitibi Canyon GS Protection Modifications   Complete Final Report
2010-EX498 ONTARIO POWER GENERATION - HYDRO Replace T20 at Chats Falls GS Chats Falls GS Like for Like 2010-Q4 Complete Final Report
2010-EX499 HYDRO ONE NETWORKS INC. Transfer Load to Horner TS Horner TS Low Voltage Feeder Breaker   Complete Final Report
2010-EX500 HYDRO ONE NETWORKS INC. Reconfiguration of Orangeville TS Orangeville TS Station Work   Complete Final Report
2010-EX501 ABITIBI-CONSOLIDATED COMPANY OF CANADA Modifications to Iroquois Falls LR/GR scheme Iroquois Falls GS Special Protection System 2013-Q2 Complete Final Report
2010-EX502 HYDRO ONE NETWORKS INC. Install capacitor at Midurst TS & Orillia TS Midhurst TS & Orillia TS Low Voltage Reactive Compensation   Complete Final Report
2010-EX503 HYDRO ONE NETWORKS INC. Replace failed Manby breaker H1L15 Manby TS Like for Like 2010-Q3 Complete Final Report
2010-EX504 HYDRO ONE NETWORKS INC. Replace failed Essa T3 B phase Essa TS Like for Like 2010-Q4 Complete Final Report
2010-EX505 HYDRO ONE NETWORKS INC. Richview T7/T8 Transformer replacement Richview TS Like for Like 2011-Q2 Complete Final Report
2010-EX506 CAPITAL POWER Replace Failed Tunis T1 Tunis GS Like for Like 2010-Q3 Complete Final Report
2010-EX507 TEMBEC Spruce Falls Protection Changes Spruce Falls Mill Protection Modifications   Active  
2010-EX508 HYDRO ONE NETWORKS INC. New circuit switchers at Woodstock TS Woodstock TS Modified Connection 2011-Q3 Complete Final Report
2010-EX509 ONTARIO POWER GENERATION - HYDRO Lambton G3 Exciter upgrade Lambton GS Replacement of Generator Controls 2011-Q1 Complete Final Report
2010-EX510 ABITIBI CONSOLIDATED HYDRO LTD PARTNERSHIP Kenora GS Control System upgrade Kenora GS Replacement of Generator Controls 2010-Q3 Complete Final Report
2010-EX511 HYDRO ONE NETWORKS INC. Increase SC ratings of 3 Bruce A breakers Bruce A TS Transmission Upgrades   Complete Final Report
2010-EX512 LAKE HURON PRIMARY WATER SUPPLY SYSTEM Back up generation at Lake Huron WTP Lake Huron WTP Non-Impactive New Equipment 2012-Q1 Complete Final Report
2010-EX513 HYDRO ONE NETWORKS INC. Glengrove TS new T2 & T4 bus arrangement Glengrove TS Station Work 2011-Q1 Complete Final Report
2010-EX514 HYDRO ONE NETWORKS INC. New Disconnects on M20D/M21D at Preston TS Preston TS Non-Impactive New Equipment 2011-Q4 Complete Final Report
2010-EX515 HYDRO ONE NETWORKS INC. Replace 500 kV breakers at Hanmer TS Hanmer TS Like for Like 2013-Q2 Complete Final Report
2010-EX516 HYDRO ONE NETWORKS INC. Rebuild 115 kV switchyard at Hearn SS Hearn SS Station Work 2014-Q3 Complete Final Report
2010-EX517 ONTARIO POWER GENERATION - HYDRO R. H. Saunders protection upgrades R. H. Saunders GS Protection Modifications 2011-Q1 Complete Final Report
2010-EX518 SUNCOR ENERGY INC. Protection Changes at Suncor TS Sarnia Protection Modifications 2011-Q1 Complete Final Report
2010-EX519 KITCHENER-WILMOT HYDRO INC. Replace T5 at MTS#3 Kitchener MTS#3 Like for Like 2011-Q3 Complete Final Report
2010-EX520 ONTARIO POWER GENERATION - HYDRO Lennox 4 kV bus protection upgrade Lennox GS Protection Modifications 2011-Q1 Complete Final Report
2010-EX521 HYDRO ONE NETWORKS INC. Reconfigure transformers at Wallaceburg TS Wallaceburg TS Modified Connection 2012-Q2 Complete Final Report
2011-EX522 HYDRO ONE NETWORKS INC. Burleigh DS Transformer Replacement Burleigh DS Like for Like   Withdrawn Final Report
2011-EX523 HYDRO ONE NETWORKS INC. Trafalgar T14 Replacement Trafalgar TS Like for Like 2012-Q3 Complete Final Report
2011-EX524 ONTARIO POWER GENERATION - HYDRO Lambton G4 Exciter Upgrade Lambton GS Replacement of Generator Controls 2011-Q1 Complete Final Report
2011-EX525 HYDRO ONE NETWORKS INC. Wiltshire LV refurbishment Wiltshire TS Low Voltage Feeder Breaker 2011-Q4 Complete Final Report
2011-EX526 HYDRO ONE NETWORKS INC. Carlaw TS LV Refurbishment Carlaw TS Low Voltage Feeder Breaker 2012-Q2 Complete Final Report
2011-EX527 TRANSALTA COGENERATION LP. TA Mississauga AVR & controller upgrades TA Mississauga (Douglas) Replacement of Generator Controls 2011-Q2 Complete Final Report
2011-EX528 ONTARIO POWER GENERATION - HYDRO Beck 2 Disconnect switch replacement Beck 2 GS Like for Like 2013-Q4 Complete Final Report
2011-EX529 ONTARIO POWER GENERATION - HYDRO Beck PGS T31 & T32 transformer replacements Beck PGS Like for Like 2011-Q4 Complete Final Report
2011-EX530 HYDRO ONE NETWORKS INC. Hydro One Breaker replacements Various Like for Like 2013-Q4 Complete Addendum 1
2011-EX531 HYDRO ONE NETWORKS INC. KL35 breaker replacement at Cherrywood North Cherrywood North TS Like for Like   Complete Final Report
2011-EX532 HYDRO ONE NETWORKS INC. Replace Hanover T4 Hanover TS Like for Like 2011-Q3 Complete Final Report
2011-EX533 ONTARIO POWER GENERATION - HYDRO Alexander G4 rewind Alexander GS Generator Upgrades 2012-Q1 Complete Final Report
2011-EX534 ONTARIO POWER GENERATION - HYDRO Barrett Chute G3&G4 generator breaker replacement Barrett Chute GS New Breakers 2011-Q4 Complete Final Report
2011-EX535 CAPITAL POWER Replace temp Tunis T1 with permanent unit Tunis GS Like for Like 2012-Q2 Complete Final Report
2011-EX536 HYDRO ONE NETWORKS INC. New 115 kV transformer breakers at Main TS Main TS New Breakers 2013-Q4 Complete Final Report
2011-EX537 HYDRO ONE NETWORKS INC. New Shunt reactors on H1L and H3L H1L and H3L Reactive Compensation 2014-Q2 Complete Final Report
2011-EX538 HYDRO ONE NETWORKS INC. Add new T3 to create a 2nd DESN at Kent TS Kent TS Modified Connection 2012-Q1 Complete Final Report
2011-EX539 BROOKFIELD RENEWABLE POWER INC. Exciter Replacement at Steephill Falls.GS Steephill Falls GS Replacement of Generator Controls 2011-Q4 Complete Final Report



2011-EX540 HYDRO ONE NETWORKS INC. Install 2 ohm bus tie reactors at various stations Various Low Voltage Reactive Compensation   Complete Final Report
2011-EX541 HYDRO ONE NETWORKS INC. Replace Longwood R3N, R6N, R7N and Hawthorne R3N Longwood and Hawthorne Like for Like 2011-Q3 Complete Final Report
2011-EX542 HYDRO ONE NETWORKS INC. 115 kV breaker upgrade at Allanburg TS Allanburg TS Like for Like 2014-Q3 Complete Final Report
2011-EX543 HYDRO ONE NETWORKS INC. Install 1 ohm series reactor at Birch TS Birch TS Low Voltage Reactive Compensation 2012-Q1 Complete Final Report
2011-EX544 HYDRO ONE NETWORKS INC. Replace SC12SC at Dymond TS Dymond TS Like for Like 2011-Q3 Complete Final Report
2011-EX545 GREAT LAKES POWER - GENERATION Clergue TS Transformer Overload Protection Clergue TS Protection Modifications 2011-Q4 Complete Final Report

2011-EX546 POWERSTREAM INC. Replace T1-V71P at Richmond Hill MTS#1 Richmond Hill TS#1 Like for Like 2011-Q2 Complete Final Report
2011-EX547 ABIBO CANADA Thunder Bay Mill HV equipment replacement Thunder Bay Mill Like for Like 2011-Q3 Complete Final Report

2011-EX548 HYDRO ONE NETWORKS INC. Replace transformers at Smooth Rock Falls DS Smooth Rock Falls Modified Connection 2011-Q4 Complete Final Report
2011-EX549 HYDRO ONE NETWORKS INC. Station Upgrades at Goderich TS Goderich TS Modified Connection 2012-Q4 Complete Final Report
2011-EX550 ONTARIO POWER GENERATION - PICKERING PROJECTS Pickering B main generator relay replacement Pickering B GS Protection Modifications 2012-Q1 Complete Final Report
2011-EX551 GREAT LAKES POWER - TRANSMISSION Removal of Third Line Total LR schemes Third Line TS Protection Modifications   Complete Final Report
2011-EX552 ONTARIO POWER GENERATION - HYDRO Replace DC exciter at Chats Falls G8 Chats Falls GS Replacement of Generator Controls 2011-Q2 Complete Final Report
2011-EX553 HYDRO ONE NETWORKS INC. A3-A4 LV Refurbishment at Strachan TS Strachan TS Station Work 2011-Q3 Complete Final Report
2011-EX554 ONTARIO POWER GENERATION - HYDRO Local GR scheme at Cameron Falls & Alexander GS Various Non-Impactive New Equipment 2013-Q2 Complete Final Report
2011-EX555 ONTARIO POWER GENERATION - HYDRO Replace LP turbines at Lennox G3 Lennox Generator Upgrades 2012-Q1 Complete Final Report
2011-EX556 ONTARIO POWER GENERATION - HYDRO 4 kV bus protection upgrade at Nanticoke GS Nanticoke GS Protection Modifications   Complete Final Report
2011-EX557 ONTARIO POWER GENERATION - HYDRO Replace T1 at Silver Falls GS Silver Falls GS Like for Like 2011-Q4 Complete Final Report
2011-EX558 POWERSTREAM INC. Back-up generation at IBM Data Center in Barrie Barrie Non-Impactive New Equipment 2012-Q1 Complete Final Report
2011-EX559 NORTHLAND POWER INC. AVR Replacements at Kirkland Lake Power Kirkland Lake Power Generator Upgrades 2011-Q3 Complete Final Report
2011-EX560 HYDRO ONE NETWORKS INC. B10/B11/B18H/B20H conductor replacement Burlington TS and Beach TS Transmission Upgrades 2012-Q1 Complete Final Report
2011-EX561 ONTARIO POWER GENERATION - HYDRO Replace T7 at Beck #1 GS Beck #1 GS Like for Like   Complete Final Report
2011-EX562 ONTARIO POWER GENERATION - HYDRO Replace DC exciter at Chats Falls G5 Chats Falls G5 Replacement of Generator Controls 2013-Q3 Complete Final Report
2011-EX563 HYDRO ONE NETWORKS INC. LV upgrades at Bruce HWB TS Bruce HWB TS Station Work 2015-Q1 Active  
2011-EX564 ONTARIO POWER GENERATION - HYDRO Caribou W3C Line protection replacement W3C Protection Modifications 2011-Q4 Complete Final Report
2011-EX565 ONTARIO POWER GENERATION - HYDRO Replace Beck 2 SS protections Beck 2 SS Protection Modifications 2011-Q3 Complete Final Report
2011-EX566 HYDRO ONE NETWORKS INC. Upgrade LXL circuits Lambton TS and Macksville Jct Transmission Upgrades 2014-Q4 Complete Final Report
2011-EX567 ONTARIO POWER GENERATION - PICKERING PROJECTS Replace disconnect switches at Pickering A G4 Pickering A Like for Like 2011-Q4 Complete Final Report
2011-EX568 HYDRO ONE NETWORKS INC. Replace KL1 at Lakehead TS Lakehead TS Like for Like   Withdrawn  
2011-EX569 HYDRO ONE NETWORKS INC. T3 Replacement at Manitoulin TS Manitoulin TS Like for Like 2012-Q4 Complete Final Report
2011-EX570 VALE INCO LTD. Replace tie disc switch at Frood Stobie #2 SS Frood Stobie #2 SS Like for Like 2011-Q4 Complete Final Report
2011-EX571 HYDRO ONE NETWORKS INC. 115 kV breaker upgrades at Hawthorne TS Hawthorne TS Station Work   Withdrawn  
2011-EX572 ONTARIO POWER GENERATION - HYDRO Barrett Chute G4 Excitation component replacements Barrett Chute G4 Replacement of Generator Controls 2011-Q3 Complete Final Report
2011-EX573 HYDRO ONE NETWORKS INC. 2011-2014 SF6 Breaker Replacements Various Like for Like   Withdrawn  
2011-EX574 ONTARIO POWER GENERATION - HYDRO Manitou M3E Line protection replacement Manitou Falls GS Protection Modifications   Complete Final Report
2011-EX575 HYDRO ONE NETWORKS INC. Replace T2 at Lisgar TS Lisgar TS Like for Like 2011-Q4 Complete Final Report
2011-EX576 HYDRO ONE NETWORKS INC. Shunt Reactors @ Marathon TS Marathon TS Reactive Compensation 2013-Q4 Complete Final Report
2011-EX577 ONTARIO POWER GENERATION - HYDRO Replace DC exciter at Chats Falls G2 Chats Falls GS Replacement of Generator Controls 2012-Q1 Complete Final Report
2011-EX578 HYDRO ONE NETWORKS INC. Replace Terauley T4 Terauley TS Like for Like 2012-Q1 Complete Final Report
2011-EX579 H2O POWER LP Add 2nd autotransformer at Iroquois Falls CTS Iroquois Falls CTS Modified Connection 2012-Q3 Complete Final Report
2012-EX580 GOLDCORP CANADA Replace 1210M1M at Musselwhite SS Musselwhite SS Like for Like 2012-Q2 Complete Final Report
2012-EX581 ONTARIO POWER GENERATION - PICKERING PROJECTS Pickering B main generator AVR replacement Pickering B Replacement of Generator Controls   Complete Final Report
2012-EX582 VALE INCO LTD. Replace 230 kV switches on S21N S21N Like for Like 2012-Q2 Complete Final Report
2012-EX583 HYDRO ONE NETWORKS INC. Add T2 at Petawawa Craig DS Petawawa Craig DS Modified Connection 2014-Q2 Complete Final Report
2012-EX584 TRANSALTA COGENERATION LP. PSS replacements at TA Windsor TA Windsor Replacement of Generator Controls   Complete Final Report
2012-EX585 HYDRO ONE NETWORKS INC. Bruce SPS modifications Bruce x Milton Special Protection System 2014-Q3 Complete Final Report
2012-EX586 CARDINAL POWER OF CANADA L.P. Cardinal Power G2 protection replacement Cardinal Power G2 Protection Modifications 2012-Q2 Complete Final Report
2012-EX587 ONTARIO POWER GENERATION - HYDRO Des Joachims G1, G3, G5 rewind Des Joachims GS Generator Upgrades 2013-Q1 Complete Final Report
2012-EX588 ONTARIO POWER GENERATION - PICKERING PROJECTS Replace disconnect switches AT1-T1, SS1-K, & SS2-D Pickering NGS Like for Like 2012-Q4 Complete Final Report
2012-EX589 ONTARIO POWER GENERATION - HYDRO T3/T4 replacement at Barrett Chute GS Barrett Chute GS Like for Like 2012-Q4 Complete Final Report
2012-EX590 ONTARIO POWER GENERATION - HYDRO Lennox Unit #4 IP Turbine Replacement Lennox GS Generator Upgrades 2012-Q2 Complete Final Report
2012-EX591 BRUCE POWER INC. Bruce A NGS Upgrades Units 1,2,3,4 Bruce A GS Replacement of Generator Controls   Complete Final Report
2012-EX592 HYDRO ONE NETWORKS INC. Reconfigure N22W to new breaker at Buchanan TS Buchanan TS Modified Connection   Withdrawn  
2012-EX593 ONTARIO POWER GENERATION - DARLINGTON PROJECTS Replace AVRs and governors on SGs at Darlington GS Darlington GS Replacement of Generator Controls 2016-Q1 Complete Final Report
2012-EX594 BROOKFIELD RENEWABLE POWER INC. Replace excitation system at McPhail G2 McPhail G2 Replacement of Generator Controls   Complete Final Report
2012-EX595 KENORA HYDRO ELECTRIC CORP LTD. Replace T1 at Kenora MTS Kenora MTS Like for Like 2012-Q2 Complete Final Report
2012-EX596 ONTARIO POWER GENERATION - HYDRO Replace DC exciter at Chats Falls G4 Chats Falls GS Replacement of Generator Controls   Complete Final Report
2012-EX597 ONTARIO POWER GENERATION - HYDRO Beck #2 Transformer replacements Beck #2 GS Like for Like 2013-Q4 Complete Final Report
2012-EX598 XSTRATA NICKEL Falconbridge Smelter #1 SS new switcher Falconbridge Smelter #1 SS Modified Connection 2012-Q2 Complete Final Report
2012-EX599 HYDRO ONE NETWORKS INC. S2B tower replacement S2B circuit Transmission Upgrades 2013-Q4 Complete Final Report
2012-EX600 HYDRO ONE NETWORKS INC. Replace T7 & T8 at Allanburg TS Allanburg TS Like for Like 2012-Q4 Complete Final Report
2012-EX601 HYDRO OTTAWA LIMITED Replace Transformer T1 at Richmond DS Richmond DS Like for Like 2012-Q2 Complete Final Report
2012-EX602 FORD ESSEX ENGINE PLANT Replac circuit switcher at Ford Essex Engine Plant Ford Essex Engine Plant Modified Connection 2012-Q3 Complete Final Report
2012-EX603 ONTARIO POWER GENERATION - HYDRO Replace T1-R at Decew Falls #2 Decew Falls #2 Like for Like 2012-Q2 Complete Final Report
2012-EX604 NOVA Chemicals (Canada) Ltd. Nova Corruna Disconnect switch replacement Nova Corunna Like for Like 2013-Q1 Complete Final Report
2012-EX605 WESDOME GOLD MINES LTD. Replace T1 at River Gold Mine River Gold Mine Like for Like 2012-Q3 Complete Final Report
2012-EX606 PORTLANDS ENERGY CENTRE Portlands G3 Rotor Replacement Toronto Like for Like 2012-Q2 Complete Final Report
2012-EX607 RESOLUTE FOREST PRODUCTS Protection Changes at Resolute FP Thunder Bay Like for Like 2012-Q3 Complete Final Report
2012-EX608 GOLDCORP CANADA Musselwhite Mine- SVC Replacement Musslewhite Reactive Compensation 2013-Q1 Complete Final Report
2012-EX609 HYDRO ONE NETWORKS INC. Hanmer T6 Replacement Hammer TS Like for Like 2012-Q3 Complete Final Report
2012-EX610 ONTARIO POWER GENERATION - HYDRO Pine Portage G4 runner upgrade Pine Portage GS New Generation   Complete Final Report
2012-EX611 HYDRO ONE NETWORKS INC. Modifications to the Bruce SPS Bruce Special Protection System 2013-Q4 Complete Final Report
2012-EX612 BROOKFIELD POWER Change tap setting at Nagagami Shekak T1 Nagagami Shekak GS Unavailable 2012-Q3 Complete Final Report
2012-EX613 HYDRO ONE NETWORKS INC. Shunt Reactors at Dryden TS Dryden TS Reactive Compensation 2014-Q4 Complete Final Report
2012-EX614 HYDRO ONE NETWORKS INC. Replace T1 & T2 at Elmira TS Elmira TS Like for Like 2014-Q3 Complete Final Report
2012-EX615 HYDRO ONE NETWORKS INC. Replace T3 & T4 at Dundas TS Dundas TS Like for Like 2013-Q3 Complete Final Report
2012-EX616 HYDRO ONE NETWORKS INC. Replace T14 & T15 at Claireville TS Claireville TS Like for Like 2012-Q4 Complete Final Report
2012-EX617 ONTARIO POWER GENERATION - HYDRO Replace T1 at Whitedog Falls GS Whitedog Falls GS Like for Like 2012-Q3 Complete Final Report
2012-EX618 HYDRO ONE NETWORKS INC. Refurbish Dunnville TS Dunnville TS Station Work 2015-Q1 Complete Final Report
2012-EX619 HYDRO ONE NETWORKS INC. Change series reactors at Port Arthur TS#1 Port Arthur TS#1 Modified Connection 2013-Q4 Complete Final Report
2012-EX620 POWERSTREAM INC. Replace T2-V75P at Richmond Hill MTS#1 Richmond Hill MTS#1 Like for Like 2012-Q3 Complete Final Report
2012-EX621 HYDRO ONE NETWORKS INC. Replace Pembroke T1 & T2 Pembroke TS Like for Like 2014-Q2 Complete Final Report
2012-EX622 HYDRO ONE NETWORKS INC. Replace Keith T1 Keith TS Like for Like 2013-Q2 Withdrawn Final Report
2012-EX623 HYDRO ONE NETWORKS INC. Replace Crosby T3 Crosby TS Like for Like 2012-Q4 Complete Final Report
2012-EX624 HYDRO ONE NETWORKS INC. Replace Martindale T22 Martindale TS Like for Like 2013-Q3 Complete Final Report
2012-EX625 HYDRO ONE NETWORKS INC. Replace Chesterville T1 & T2 Chesterville TS Like for Like 2013-Q2 Complete Final Report
2012-EX626 HYDRO ONE NETWORKS INC. Replace Cobden T1 & T2 Cobden T1S Like for Like 2013-Q2 Complete Final Report
2012-EX627 HYDRO ONE NETWORKS INC. Replace Manitoulin T4 Manitoulin TS Like for Like 2013-Q3 Complete Final Report
2012-EX628 HYDRO ONE NETWORKS INC. Replace Kirkland Lake T12 & T13 Kirkland Lake TS Like for Like 2013-Q3 Complete Final Report
2012-EX629 KITCHENER-WILMOT HYDRO INC. Replace T14 at Kitchener MS#7 Kitchener MS#7 Like for Like 2012-Q4 Complete Final Report
2012-EX630 HYDRO ONE NETWORKS INC. Replace Lennox R51 & R52 Lennox TS Like for Like 2012-Q4 Complete Final Report
2012-EX631 HYDRO ONE NETWORKS INC. Replace T2 at Strathroy TS Strathroy TS Like for Like 2012-Q4 Complete Final Report
2012-EX632 NOVELIS INC. Replace main breaker at Novelis Novelis Like for Like 2012-Q4 Complete Final Report
2012-EX633 BROOKFIELD RENEWABLE POWER INC. Wells G2 - Generator Upgrades Wells GS Generator Upgrades 2013-Q4 Complete Final Report
2012-EX634 HYDRO ONE NETWORKS INC. Replace Larchwood T2 Larchwood TS Like for Like 2013-Q4 Complete Final Report
2012-EX635 HYDRO ONE NETWORKS INC. Derate T2 at Leslie TS Leslie TS Modified Connection 2017-Q1 Complete Final Report
2012-EX636 BRUCE POWER INC. Replace MOT 3 & 4 at Bruce A GS Bruce A GS Like for Like   Complete Final Report
2012-EX637 HYDRO ONE NETWORKS INC. Like-for-like LV Shunt Reactor Replacements Various Like for Like   Complete Final Report
2012-EX638 HYDRO ONE NETWORKS INC. LV Shunt Capacitor replacements Various Like for Like 2012-Q4 Complete Final Report
2012-EX639 BRUCE POWER INC. Replace stator in G4 Bruce GS Generator Upgrades   Complete Final Report
2012-EX640 SUNCOR ENERGY PRODUCTS INC. Reverse Power Protection at Ripley WF Ripley Wind Farm Protection Modifications   Complete Final Report
2012-EX641 WATERLOO NORTH HYDRO INC. Protection Upgrades at Scheifele B MTS Scheifele B MTS Protection Modifications   Complete Final Report
2012-EX642 HYDRO ONE NETWORKS INC. New HVDS for Namakan GS High Falls New Supply Point   Active  
2013-EX643 ONTARIO POWER GENERATION - HYDRO Replace MOT1 at Atikokan GS Atikokan GS Like for Like   Complete Final Report
2013-EX644 ONTARIO POWER GENERATION - HYDRO Replace DC exciter at Chats Falls G3 Chats Falls Replacement of Generator Controls   Complete Final Report
2013-EX645 HYDRO ONE NETWORKS INC. Timmins TS: EOL 115 kV Asset Replacement Project Timmins, Ontario Transmission 2014-Q4 Complete Final Report
2013-EX646 HYDRO ONE NETWORKS INC. Replace T1 and T2 at Woodstock TS Woodstock TS Like for Like 2013-Q4 Complete Final Report
2013-EX647 ONTARIO POWER GENERATION - HYDRO Decew Falls #2 Governor Replacement Decew Falls #2 GS Replacement of Generator Controls 2013-Q3 Complete Final Report
2013-EX648 HYDRO ONE NETWORKS INC. Upgrade Thermal Loading Beck x Murray Beck x Murray Transmission Upgrades 2013-Q4 Active  
2013-EX649 ONTARIO POWER GENERATION - HYDRO Protection upgrades at Stewartville GS Stewartville GS Protection Modifications   Complete Final Report
2013-EX650 HYDRO ONE NETWORKS INC. Reconfigure station service at Nanticoke SS Nanticoke SS Station Work   Active  
2013-EX651 ONTARIO POWER GENERATION - HYDRO Replacement of Stewartville G5 exciter Stewartville GS Replacement of Generator Controls   Complete Final Report
2013-EX652 HYDRO ONE NETWORKS INC. Replace Brant T1 and T2 Brant TS Like for Like 2014-Q1 Complete Final Report
2013-EX653 ENBRIDGE PIPELINES INC. Replace Circuit Switcher at Westover South Westover South Like for Like   Complete Final Report
2013-EX654 HYDRO ONE NETWORKS INC. Replace Regulator TR1 at Hinchinbrook DS Hinchinbrook DS Like for Like 2013-Q2 Complete Final Report
2013-EX655 HYDRO HAWKESBURY Replace T1 at Hawkesbury MTS Hawkesbury MTS Like for Like 2013-Q4 Complete Final Report
2013-EX656 HYDRO ONE NETWORKS INC. D1A/D3A Conductor Replacement St Johns Valley Jct to Decew Falls SS Transmission Upgrades 2013-Q4 Complete Final Report
2013-EX657 HYDRO ONE NETWORKS INC. Replace Thorold T2 Thorold TS Like for Like 2013-Q3 Complete Final Report
2013-EX658 HYDRO ONE NETWORKS INC. Overbrook TS Asset Replacement Project Ovberbrook TS Station Work 2015-Q4 Complete Final Report
2013-EX659 ENBALA POWER NETWORKS ENBALA Load Aggregation Various 2013-Q3 Complete Final Report
2013-EX660 ONTARIO POWER GENERATION - HYDRO Like for Like Replacement of Generator Breakers Various Like for Like   Complete Final Report
2013-EX661 BROOKFIELD RENEWABLE POWER INC. Hollingsworth GS Refurbishment Hollingsworth GS Replacement of Generator Controls 2014-Q4 Complete Final Report
2013-EX662 GREAT LAKES POWER - TRANSMISSION Add Steephill disconnect switch Steephill 115 kV line Non-Impactive New Equipment 2013-Q3 Complete Final Report
2013-EX663 HYDRO ONE NETWORKS INC. C27P Conductor Replacement Chats Falls SS X Galetta JCT Transmission Upgrades 2014-Q4 Complete Final Report
2013-EX664 HYDRO ONE NETWORKS INC. C25H Conductor Replacement Chats Falls SS X Havlock TS Transmission Upgrades 2014-Q4 Complete Final Report
2013-EX665 HYDRO ONE NETWORKS INC. H27H Conductor Replacement Bannockburn JCT X Havelock TS Transmission Upgrades 2014-Q4 Complete Final Report
2013-EX666 HYDRO ONE NETWORKS INC. H24C Conductor Replacement Marine JCT X Oshawa North JCT Transmission Upgrades 2015-Q4 Complete Final Report
2013-EX667 BROOKFIELD RENEWABLE POWER INC. Replace G1 exciter at McPhail GS McPhail GS Replacement of Generator Controls 2013-Q4 Complete Final Report
2013-EX668 ONTARIO POWER GENERATION - HYDRO Atikokan G1 Control Upgrade Atikokan GS Replacement of Generator Controls 2014-Q1 Complete Final Report
2013-EX669 HYDRO ONE NETWORKS INC. Margach DS T2 Replacement Margach DS Like for Like 2013-Q3 Complete Final Report
2013-EX670 H2O POWER LP Norman T1 Replacement & substation upgrade Norman CGS Station Work 2014-Q3 Complete Final Report
2013-EX671 HYDRO OTTAWA LIMITED Replace T1 at Richmond DS Richmond DS Like for Like 2013-Q2 Complete Final Report
2013-EX672 ONTARIO POWER GENERATION - HYDRO Pine Portage GS Upgrade Pine Portage GS New Generation 2014-Q3 Complete Final Report
2013-EX673 ONTARIO POWER GENERATION - HYDRO Alexander T1 and T1-L replacement Alexander GS Like for Like 2013-Q4 Complete Final Report
2013-EX674 HYDRO ONE NETWORKS INC. Replace Keith T22 Keith TS Like for Like 2013-Q4 Complete Final Report
2013-EX675 HYDRO ONE NETWORKS INC. Replace Hanover T3 Hanover TS Like for Like 2014-Q2 Complete Final Report
2013-EX676 HYDRO ONE NETWORKS INC. Refurbish Cooksville TS Cooksville TS Like for Like 2014-Q1 Complete Final Report
2013-EX677 HYDRO ONE NETWORKS INC. Replace T7 & T8 at Hanmer TS with single T8 Hanmer TS Modified Connection 2014-Q4 Active  
2013-EX678 HYDRO ONE NETWORKS INC. Replace Manotick T1 Manotick DS Like for Like 2014-Q2 Complete Final Report
2013-EX679 ONTARIO POWER GENERATION - HYDRO Pine Portage T2 Protection Upgrade Pine Portage SS Like for Like 2013-Q3 Complete Final Report
2013-EX680 ONTARIO POWER GENERATION - HYDRO Lennox Protection Upgrade Lennox GS Protection Modifications   Complete Final Report
2013-EX681 WEST WINDSOR POWER West Windsor Power -Turbine upgrade West Windsor Power Plant New Generation   Complete Final Report
2013-EX682 WESDOME GOLD MINES LTD. Replacement of T1 at River Gold Mine River Gold Mine CTS Like for Like 2013-Q3 Complete Final Report
2013-EX683 NIAGARA WEST TRANSFORMER CORPORATION Install bus tie reactor at Niagara West TS Niagara West TS Station Work 2014-Q1 Complete Final Report
2013-EX684 HYDRO ONE NETWORKS INC. Replace Almonte T3 Almonte TS Like for Like 2013-Q4 Complete Final Report
2013-EX685 HYDRO ONE NETWORKS INC. Replace H2JK Esplanade TS x John TS Esplanade TS x John TS Like for Like 2013-Q4 Complete Final Report
2013-EX686 WESDOME GOLD MINES LTD. T1 Replacement at River Gold Mine Northeast Like for Like   Complete Final Report
2013-EX687 ONTARIO POWER GENERATION - HYDRO Replace Exciters at Ear Falls Ear Falls GS Replacement of Generator Controls 2013-Q2 Complete Final Report
2013-EX688 NRSTOR INC. Flywheel Frequency Regulation Minto, ON Unavailable   Active  
2013-EX689 HYDRO ONE NETWORKS INC. Relocation of 230 kV circuits in Manvers area Manvers Transmission   Active  
2013-EX690 ONTARIO POWER GENERATION - HYDRO Aguasabon G1 Runner Replacement Aguasabon GS New Generation   Active  
2013-EX691 NIAGARA-ON-THE-LAKE HYDRO INC. Capacity Upgrade at NOTL MTS1 or MTS2 NOTL MTS1or MTS2 Station Work   Active  
2013-EX692 POWERSTREAM INC. Installation of bus tie reactors Markham MTS1, 2, 3 & 3E Station Work   Complete Final Report
2014-EX693 ONTARIO POWER GENERATION - HYDRO Chats Falls DC Exciter replacements Chats Falls GS Replacement of Generator Controls   Active  
2014-EX694 HYDRO ONE NETWORKS INC. Protection Changes on 115kV circuits A36N and A37N Allanburg x Murray Protection Modifications   Active  
2014-EX695 ONTARIO POWER GENERATION - HYDRO Lower Notch Exciter Replacement Lower Notch GS Replacement of Generator Controls   Active  
2014-EX696 HYDRO ONE NETWORKS INC. D10S/D9HS Line Refurbishment Vansickle TS to Glendale TS Transmission Upgrades   Active  
2014-EX697 H2O POWER LP Norman GS Upgrade Norman GS New Generation   Active  
 