Change Notification Listing

The listing below provides advance notice of pending changes to the Market Rules, Market Manuals, technical interfaces or other items that define the operation of the IESO-administered market. For changes that are minor, the listing will identify the document that is changing and a description of the changes, but a link to the altered document may not be included. Comments regarding implementation concerns can be sent to pending.changes@IESO.ca. Details of the market rule process are provided at the Market Rule Amendment process.

Details of all of the documents being revised for this baseline are available in the baseline plan.
Current Baseline Plan

Document Type:
Item Last
Updated
Comments
Due
Target
Implementation
Stakeholder
Engagement
 
Charge Types and Equations IMP_LST_0001 Ver. 28.2 13-May-2008 N/A Baseline 19.1  
Two out-of-date references were updated. See yellow highlighted text on Reference page.The Ontario Power Authority (OPA) is implementing a contractual load reduction program for participants that can provide an initial minimum demand response (DR) capability as identified within the Program Rules. DR3 has been designed to provide the OPA with additional contractual DR capability to alleviate general and localized electricity supply constraints on the IESO-controlled grid. The IESO will be utilized for the purposes of dispatch, settlement, measurement and verification. The charge types listed below facilitate the settlement of the DR3 program. This baseline includes a change to DR3 Charge Types (CT) equation CT 1342 and 1344. A redundant factor and corresponding description was removed from the 'Availability Set-Off (Low Confirmation)' formula. There is no impact on participants.
 
Market Manual 6 Participant Technical Reference Manual, IMO_MAN_0024, Ver 17.1 9-May-2008 N/A Baseline 19.1  
Reason for Change: New approved RTU Vendors have been added to list. Description of Impact: Information for Market Participants.
 
Participation Agreement MDP_AGR_0012 ver.11.1 2-May-2008 N/A Baseline 19.1  
Reason for Change: The reference in the participation agreement to the OSC rule is replaced with the National Instrument reference. Description of Impact: Changes to "accredited investor" description.
 
MM2: Market Administration, 2.6: Treatment of Compliance Issues, MDP_PRO_0022 Ver. 13.2 1-May-2008 N/A Baseline 19.1 Stakeholder Information
The defined terms that are italicized have been updated and Appendix B has been updated to be consistent with the revision to the market rules. Revision made to procedures to reflect market rule changes and stakeholdering to streamline the process and limit or remove measures that duplicate legal protections available to a defaulting market participant outside of the market rules.
 
MM2: Market Administration, 2.1 Dispute Resolution, MDP_PRO_0017 Ver. 11.2 1-May-2008 N/A Baseline 19.1 Stakeholder Information
Revised to clarify that a 'Notice of Dispute' must be submitted to commence good faith negotiations and again to commence mediation and/or arbitration. The obligation to undertake good faith negotiations currently found in Chapter 3, section 2.4.1 of the market rule will apply to all disputes. Currently, section 2.4.3 exempts specific types of disputes from the requirement to negotiate in good faith and section 2.5.1A imposes a limitation period of 20 business days for the filing of a notice of dispute for those claims. The combined effect of these two restrictions is to limit the time available for the parties to engage in any meaningful negotiations at the outset of the proceeding. The procedure is being revised to include a minimum 30-day window for good faith negotiations for all disputes under the market rules and to provide details of how to initiate good faith negotiations. MPs will have to prepare for good faith negotiations for all disputes.
 
Market Manual 1: Market Entry, Maintenance & Exit Part 1.3: Identity Management Operations Guide IMP_GDE_0088 Ver. 14.1 24-Apr-2008 29-Apr-2008 Baseline 19.1  
Reason for Change: Procedural references to IESO System Access Request and Identity Management IMO_FORM - 1276 need to be updated to reflect the current version of the form that is being changed for this baseline, and to reflect the new Outbound Report Management System (ORMS) identity management protocols Description of Change: All Identity Management procedures involving identity credentials are updated to reflect the current 1276 form and ORMS identity management. Those impacted by this change are end users who use a PKI digital certificate or userID / password to access the secure IESO systems for MOSMIM MPI or MIM API, Portal or ORMS
 
MM4: Market Operations, 4.4: Transmission Rights Auction MDP_PRO_0029 Ver. 12.1 22-Apr-2008 29-Apr-2008 Baseline 19.1  
This document contains reference to outdated department names, email addresses, etc. MPs will see slight cosmetic changes. No major impact to Market Participants.
 
System Impact Assessment Application (IESO)/Customer Impact Assessment Application (Hydro One) for Load Facilities IMO_FORM_1538 ver. 3.1 21-Apr-2008 29-Apr-2008 N/A  
This form has been revised to combine Hydro One's Customer Impact Assessment application form with IESO's. Applicants will submit one form only instead of two forms.
 
MM5:Settlements, 5.5: Physical Markets and Settlement Statements MDP_PRO_0033 Ver 30.2. 15-Apr-2008 N/A Baseline 19.1 Stakeholder Information
Section 1.6.3.1 - Aligned the OPG Rebate amount payable by OPG with amendments to Schedule B of IESO's licence as per the Order in Council No. 137/2008 effective May 7, 2008. This document is changing to remove the notification that as of April 1, 2008, directly connected consumers are no longer eligible for Regulated Price Plan (RPP) rates as a result of recent amendments to Ontario Regulation 95/05. Also removed references to Form 1535, 1556, 1564, 1598 as the data formerly submitted on these forms will now be submitted via the IESO Portal. Participants may need to update their own documentation and assess their processes.
 
IESO System Access Request and Identity Management, IMO-FORM-1276 ver 15.1 15-Apr-2008 29-Apr-2008 Baseline 19.1  
This form is being updated to align with the recent changes to submission of on line Settlement forms. Cosmetic changes and some wording changes in description areas. There is no major impact to Market Participants. Changes include, 1. Allow 'form fields' in areas previously locked on form 2. Increase length of some 'form fields' 3. Add additional wording in description areas 4. Add additional check boxes in IESO System Access Steward declaration (Section 5.5); and 5. Cosmetic changes to shaded areas and lines.
 
MM2: Market Administration, 2.10: Connection Assessment and Approval MDP_PRO_0048 Ver. 8.1 15-Apr-2008 29-Apr-2008 Baseline 19.1 Stakeholder Information
The IESO has revised the queue allocation principles and the rights associated with the queue position in the CAA procedure. These changes align the market manual with the current process, which has reduced the number of unnecessary or repeated studies and, therefore, has reduced the time and cost for proponents, transmitters and the IESO. Secondly,references to project milestones and the associated proponents' obligations are being added to the market manual based on suggestions previously submitted by stakeholders. Finally, various other CAA process details are being clarified within the market manual to align it to the current process. Due to the number of changes in this document participants should refer to the table of changes in the document.
 
MM2: Market Administration, 2.12: Treatment of Local Market Power IMO_PRO_0034 Ver. 8.1 15-Apr-2008 29-Apr-2008 Baseline 19.1 Stakeholder Information
Reason for Change: 1) Need to increase number of representative COWZ nodes 2) Need to clarify treatment of TLR curtailments. Description of Change: 1) Explanation of the use of up to 5 nodes to represent possible constrained off watch zones. 2) Explanation why transactions constrained off under the TLR process are considered pivotal for the purpose of the sufficient competition screen for local market power. Description of Impact: 1) More faithful estimates of the nodal prices for the assessment of watch zones. 2) Better understanding by traders of possible review of CMSC payments under local market power process.
 
MM4: Market Operations, 4.2 Submission of Dispatch Data in the Real-Time Energy and Operating Reserve Markets, MDP_PRO_0027 Ver. 31.1 15-Apr-2008 29-Apr-2008 Baseline 19.1  
This document is being revised to include the information provided in IESO_IMDC_0131 that is currently posted on the Rules and Manuals page.
 
MM4: Market Operations, 4.3 Real Time Scheduling of the Physical Markets IMP_PRO_0034 Ver. 26.1 15-Apr-2008 29-Apr-2008 Baseline 19.1  
This document is being revised to include the information provided in IESO_IMDC_0131 & IESO_IMDC_0132 that are currently posted on the Rules and Manuals page.
 
IESO-Controlled Grid Operating Policies IMP_POL_0002 ver. 19.1 15-Apr-2008 29-Apr-2008 Baseline 19.1  
Included more detail on public appeals by revising Appendix E: Emergency Operating State Control Actions (EOSCA) list.
 
Notice of Dispute, IMO_FORM_1001 ver.6.1 15-Apr-2008 29-Apr-2008 Baseline 19.1  
Reason for Change: Process change to require good faith negotiations. Description of Change: Instructions for submission of form changes. Description of Impact: Participants may familiarize themselves with the changes in process to commence good faith negotiations for dispute resolution.
 
 